IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,766

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0837 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,463 $625 Implemented
MA0837 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,956 $500 Implemented
MA0837 # 06 Y:2022 06 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,316 $600 Implemented
MA0837 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,317 $2,500 Implemented
MA0837 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $13,524 $1,250 Implemented
MA0833 # 04 Y:2022 04 2022 USE HEAT PUMP FOR SPACE CONDITIONING $618 $94,050 Implemented
MA0833 # 02 Y:2022 02 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,258 $840 Implemented
MA0833 # 03 Y:2022 03 2022 USE HEAT PUMP FOR SPACE CONDITIONING $5,709 $2,500 Implemented
MA0832 # 02 Y:2022 02 2022 USE HEAT PUMP FOR SPACE CONDITIONING $3,806 $2,150 Implemented
MA0832 # 03 Y:2022 03 2022 USE HEAT PUMP FOR SPACE CONDITIONING $1,101 $12,675 Implemented
MA0832 # 04 Y:2022 04 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,184 $600 Implemented
MA0831 # 05 Y:2022 05 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $41,831 $1,000 Implemented
MA0831 # 09 Y:2022 09 2022 INSULATE FEEDWATER TANK $798 $1,376 Implemented
MA0831 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,489 $9,040 Implemented
MA0831 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,657 $42,058 Implemented
MA0829 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,700 $4,400 Implemented
MA0829 # 07 Y:2022 07 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,594 $5,100 Implemented
MA0829 # 06 Y:2022 06 2022 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $2,891 $4,445 Implemented
MA0825 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $54,067 $150,000 Implemented
MA0825 # 05 Y:2021 05 2021 MINIMIZE WATER USAGE $24,897 $6,250 Implemented
MA0825 # 03 Y:2021 03 2021 RECOVER WASTE HEAT FROM EQUIPMENT $41,012 $52,945 Implemented
MA0825 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $93,702 $30,000 Implemented
MA0827 # 04 Y:2021 04 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,685 $2,000 Implemented
MA0827 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,909 $26,950 Implemented
MA0826 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $979 $1,631 Implemented