IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,391

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0156 # 03 Y:1999 03 1999 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $461,046 $1,000,000 Implemented
NC0156 # 04 Y:1999 04 1999 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $65,000 $80,000 Implemented
NC0147 # 01 Y:1998 01 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,282 $200 Implemented
NC0147 # 02 Y:1998 02 1998 RECOVER WASTE HEAT FROM EQUIPMENT $610 $500 Implemented
NC0147 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,356 $4,000 Implemented
NC0147 # 05 Y:1998 05 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $375 $200 Implemented
NC0147 # 06 Y:1998 06 1998 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $14,809 $0 Implemented
NC0152 # 03 Y:1998 03 1998 COVER OPEN TANKS $1,006 $100 Implemented
NC0152 # 05 Y:1998 05 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,160 $0 Implemented
NC0152 # 07 Y:1998 07 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $563 $200 Implemented
NC0141 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $556 $60 Implemented
NC0141 # 02 Y:1998 02 1998 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $5,943 $10,000 Implemented
NC0141 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,183 $4,236 Implemented
NC0141 # 04 Y:1998 04 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $31,048 $4,000 Implemented
NC0141 # 07 Y:1998 07 1998 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,861 $200 Implemented
NC0145 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $22,875 $100 Implemented
NC0145 # 06 Y:1998 06 1998 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,125 $150 Implemented
NC0149 # 02 Y:1998 02 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,438 $100 Implemented
NC0149 # 03 Y:1998 03 1998 PURCHASE APPROPRIATELY SIZED MATERIAL $6,400 $1,000 Implemented
NC0149 # 04 Y:1998 04 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $938 $200 Implemented
NC0149 # 05 Y:1998 05 1998 RECYCLE CLEANING SOLVENT AND REUSE $1,472 $100 Implemented
NC0149 # 06 Y:1998 06 1998 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $4,320 $800 Implemented
NC0150 # 04 Y:1998 04 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $244 $800 Implemented
NC0150 # 05 Y:1998 05 1998 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,244 $4,400 Implemented
NC0148 # 02 Y:1998 02 1998 REDUCE FLUID FLOW RATES $304 $550 Implemented