IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0732 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,800 $1,241 Implemented
OK0732 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,627 $3,627 Implemented
OK0732 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,116 $1,065 Implemented
OK0693 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,903 $31,913 Implemented
OK0693 # 08 Y:2004 08 2004 INSTALL TIMERS AND/OR THERMOSTATS $772 $1,140 Implemented
OK0693 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $356 $737 Implemented
OK0692 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,239 $2,275 Implemented
OK0692 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,221 $8,625 Implemented
OK0692 # 06 Y:2004 06 2004 INSTALL SET-BACK TIMERS $81,447 $10,000 Implemented
OK0692 # 07 Y:2004 07 2004 $8,800 $0 Implemented
OK0692 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,577 $11,882 Implemented
OK0683 # 03 Y:2004 03 2004 OPTIMIZE PLANT POWER FACTOR $8,063 $7,713 Implemented
OK0683 # 07 Y:2004 07 2004 INSTALL SET-BACK TIMERS $19,818 $8,100 Implemented
OK0679 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,737 $1,067 Implemented
OK0679 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,675 $3,067 Implemented
OK0660 # 02 Y:2003 02 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,638 $7,445 Implemented
OK0660 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $279 $300 Implemented
OK0660 # 04 Y:2003 04 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,891 $450 Implemented
OK0660 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $996 $4,003 Implemented
OK0660 # 08 Y:2003 08 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $20,839 $1,606 Implemented
OK0659 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,223 $640 Implemented
OK0659 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,179 $4,683 Implemented
OK0659 # 06 Y:2003 06 2003 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $7,958 $100 Implemented
OK0631 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,487 $400 Implemented
OK0631 # 02 Y:2001 02 2001 INSULATE BARE EQUIPMENT $13,831 $8,000 Implemented