Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
216
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0694 # 11 Y:2000 | 11 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,365 | $0 | Implemented |
TN0694 # 02 Y:2000 | 02 | 2000 | ADD AREA LIGHTING SWITCHES | $17,510 | $25,030 | Implemented |
TN0694 # 03 Y:2000 | 03 | 2000 | DEVELOP A REPAIR/REPLACE POLICY | $10,755 | $5,075 | Implemented |
TN0692 # 08 Y:2000 | 08 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,336 | $0 | Implemented |
TN0692 # 06 Y:2000 | 06 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,650 | $0 | Implemented |
TN0692 # 05 Y:2000 | 05 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $4,210 | $0 | Implemented |
TN0692 # 02 Y:2000 | 02 | 2000 | ADD ADDITIONAL PRODUCTION SHIFT | $899,000 | $967,000 | Implemented |
TN0692 # 07 Y:2000 | 07 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,600 | $900 | Implemented |
TN0692 # 09 Y:2000 | 09 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,115 | $1,300 | Implemented |
TN0678 # 08 Y:2000 | 08 | 2000 | REDUCE EXCESS STEAM BLEEDING | $350 | $170 | Implemented |
TN0678 # 09 Y:2000 | 09 | 2000 | INSTALL / REPAIR INSULATION ON STEAM LINES | $277 | $0 | Implemented |
TN0678 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,470 | $695 | Implemented |
TN0652 # 04 Y:1999 | 04 | 1999 | MODIFY CURRENT INCENTIVE PROGRAM | $18,000 | $49,200 | Implemented |
TN0652 # 05 Y:1999 | 05 | 1999 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $5,625 | $16,000 | Implemented |
TN0652 # 06 Y:1999 | 06 | 1999 | REPAIR AND ELIMINATE STEAM LEAKS | $4,000 | $100 | Implemented |
TN0652 # 01 Y:1999 | 01 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $189,625 | $28,000 | Implemented |
TN0652 # 03 Y:1999 | 03 | 1999 | RECOVER AND REUSE WASTE MATERIAL | $23,000 | $60,500 | Implemented |
TN0652 # 07 Y:1999 | 07 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,700 | $4,000 | Implemented |
TN0675 # 06 Y:2000 | 06 | 2000 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,450 | $3,300 | Implemented |
TN0675 # 05 Y:2000 | 05 | 2000 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $8,725 | $6,000 | Implemented |
TN0675 # 04 Y:2000 | 04 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,789 | $16,600 | Implemented |
TN0675 # 03 Y:2000 | 03 | 2000 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $18,800 | $16,000 | Implemented |
TN0673 # 01 Y:2000 | 01 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,075 | $2,610 | Implemented |
TN0673 # 06 Y:2000 | 06 | 2000 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $160 | $0 | Implemented |
TN0663 # 01 Y:1999 | 01 | 1999 | INSTALL SPECTRAL REFLECTORS / DELAMP | $6,379 | $13,600 | Implemented |