IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

719

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0308 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,802 $5,726 Implemented
TT0305 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $637 $125 Implemented
TT0305 # 04 Y:2024 04 2024 AIR CONDITION ONLY SPACE NECESSARY $6,707 $1,060 Implemented
TT0305 # 07 Y:2024 07 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $212 $60 Implemented
TT0305 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN WATER LINES AND VALVES $12,922 $5,000 Implemented
TT0302 # 01 Y:2023 01 2023 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $141,741 $909,720 Implemented
TT0302 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,127 $1,500 Implemented
TT0302 # 05 Y:2023 05 2023 METER WASTE WATER $18,930 $1,100 Implemented
TT0304 # 06 Y:2023 06 2023 INSULATE BARE EQUIPMENT $6,857 $372 Implemented
TT0304 # 10 Y:2023 10 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $87 $50 Implemented
TT0304 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,867 $5 Implemented
TT0304 # 09 Y:2023 09 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $544 $405 Implemented
TT0304 # 07 Y:2023 07 2023 UPGRADE CONTROLS ON COMPRESSORS $5,133 $300 Implemented
TT0304 # 02 Y:2023 02 2023 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $51,075 $120 Implemented
TT0303 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,197 $2,025 Implemented
TT0303 # 02 Y:2023 02 2023 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $33,678 $1,200 Implemented
TT0303 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $39,135 $0 Implemented
TT0303 # 03 Y:2023 03 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $896 $100 Implemented
TT0303 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $11,430 $3,000 Implemented
TT0294 # 06 Y:2023 06 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,671 $500 Implemented
TT0294 # 01 Y:2023 01 2023 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $77,940 $2,000 Implemented
TT0294 # 10 Y:2023 10 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $974 $500 Implemented
TT0294 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,950 $3,100 Implemented
TT0294 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,944 $43,883 Implemented
TT0294 # 03 Y:2023 03 2023 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $14,815 $12,000 Implemented