IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

123

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0720 # 11 Y:2005 11 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $554 $0 Implemented
UD0720 # 13 Y:2005 13 2005 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $390 $0 Implemented
UD0720 # 15 Y:2005 15 2005 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $200 $340 Implemented
UD0719 # 03 Y:2005 03 2005 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $13,165 $20,000 Implemented
UD0719 # 05 Y:2005 05 2005 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,455 $12,060 Implemented
UD0719 # 07 Y:2005 07 2005 DISCONNECT BALLASTS $1,102 $75 Implemented
UD0719 # 09 Y:2005 09 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $583 $20 Implemented
UD0718 # 03 Y:2005 03 2005 $64,584 $200,000 Implemented
UD0718 # 11 Y:2005 11 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,522 $3,044 Implemented
UD0717 # 01 Y:2005 01 2005 INCREASE USE OF AUTOMATION $68,000 $145,000 Implemented
UD0717 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,783 $39,200 Implemented
UD0717 # 04 Y:2005 04 2005 REPAIR OR REPLACE STEAM TRAPS $12,702 $5,400 Implemented
UD0717 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,225 $0 Implemented
UD0717 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,553 $11,448 Implemented
UD0717 # 09 Y:2005 09 2005 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,658 $2,526 Implemented
UD0716 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,047 $65,800 Implemented
UD0716 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,922 $1,440 Implemented
UD0715 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,797 $53,464 Implemented
UD0715 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,402 $100 Implemented
UD0715 # 04 Y:2005 04 2005 REPAIR AND ELIMINATE STEAM LEAKS $2,597 $500 Implemented
UD0715 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,021 $0 Implemented
UD0715 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $781 $340 Implemented
UD0715 # 09 Y:2005 09 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $531 $0 Implemented
UD0714 # 03 Y:2005 03 2005 $12,150 $1,000 Implemented
UD0714 # 04 Y:2005 04 2005 USE MINIMUM SAFE OVEN VENTILATION $6,825 $3,000 Implemented