IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

733

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0387 # 06 Y:2001 06 2001 INSTALL OCCUPANCY SENSORS $418 $300 Implemented
WI0387 # 09 Y:2001 09 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $630 $640 Implemented
WI0387 # 10 Y:2001 10 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $387 $90 Implemented
WI0387 # 02 Y:2001 02 2001 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $24,138 $0 Implemented
WI0387 # 03 Y:2001 03 2001 INSTALL SPECTRAL REFLECTORS / DELAMP $9,794 $0 Implemented
WI0387 # 04 Y:2001 04 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,726 $1,994 Implemented
WI0387 # 07 Y:2001 07 2001 USE EVAPORATION TO CONCENTRATE MATERIAL $8,770 $16,000 Implemented
WI0382 # 07 Y:2000 07 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,081 $6,484 Implemented
WI0382 # 05 Y:2000 05 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $5,144 $0 Implemented
WI0381 # 03 Y:2000 03 2000 INSTALL TIMERS AND/OR THERMOSTATS $3,541 $0 Implemented
WI0381 # 12 Y:2000 12 2000 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $124 $300 Implemented
WI0381 # 04 Y:2000 04 2000 INSTALL AUTOMATIC STACK DAMPER $1,157 $1,000 Implemented
WI0381 # 02 Y:2000 02 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,183 $4,000 Implemented
WI0381 # 08 Y:2000 08 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,028 $1,300 Implemented
WI0379 # 06 Y:2000 06 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,945 $8,000 Implemented
WI0379 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $473 $90 Implemented
WI0378 # 10 Y:2000 10 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $279 $820 Implemented
WI0377 # 09 Y:2000 09 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,343 $7,200 Implemented
WI0377 # 12 Y:2000 12 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $272 $60 Implemented
WI0377 # 01 Y:2000 01 2000 $52,550 $0 Implemented
WI0377 # 08 Y:2000 08 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,629 $23,136 Implemented
WI0377 # 07 Y:2000 07 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,592 $8,205 Implemented
WI0375 # 02 Y:2000 02 2000 $280,000 $60,000 Implemented
WI0375 # 03 Y:2000 03 2000 $208,000 $0 Implemented
WI0375 # 01 Y:2000 01 2000 $416,000 $140,000 Implemented