IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,628

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0619 # 02 Y:2001 02 2001 REPROCESS SPENT OILS ON SITE FOR RE-USE $18,573 $6,262 Implemented
UD0619 # 03 Y:2001 03 2001 METER WASTE WATER $14,438 $500 Implemented
UD0619 # 05 Y:2001 05 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $6,322 $940 Implemented
UD0619 # 06 Y:2001 06 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,846 $5,628 Implemented
UD0619 # 07 Y:2001 07 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,873 $2,400 Implemented
UM0185 # 01 Y:2001 01 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,400 $600 Implemented
UM0185 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,546 $450 Implemented
UM0185 # 05 Y:2001 05 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $50,525 $10,000 Implemented
UD0618 # 04 Y:2001 04 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $8,474 $6,280 Implemented
UD0618 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,038 $1,450 Implemented
UD0617 # 01 Y:2001 01 2001 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $90,000 $111,000 Implemented
UD0617 # 02 Y:2001 02 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $98,016 $60,000 Implemented
UD0617 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,578 $695 Implemented
UD0615 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,423 $42,285 Implemented
UD0615 # 02 Y:2001 02 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $17,160 $0 Implemented
UD0615 # 06 Y:2001 06 2001 RECOVER WASTE HEAT FROM EQUIPMENT $5,831 $8,500 Implemented
UD0613 # 02 Y:2001 02 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $15,606 $14,000 Implemented
UD0613 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,566 $0 Implemented
UD0613 # 04 Y:2001 04 2001 USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) $5,513 $5,000 Implemented
UD0613 # 05 Y:2001 05 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,342 $0 Implemented
UD0614 # 02 Y:2001 02 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $53,184 $30,570 Implemented
UD0614 # 05 Y:2001 05 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $6,252 $0 Implemented
UD0612 # 01 Y:2001 01 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,331 $200 Implemented
UD0612 # 03 Y:2001 03 2001 INSTALL TIMERS AND/OR THERMOSTATS $782 $800 Implemented
UD0612 # 05 Y:2001 05 2001 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $533 $1,200 Implemented