IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,628

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0132 # 02 Y:1999 02 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $680 $700 Implemented
UM0132 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $667 $300 Implemented
UM0132 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $349 $1,000 Implemented
UM0132 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $815 $990 Implemented
UM0132 # 06 Y:1999 06 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $13,503 $3,700 Implemented
UM0132 # 07 Y:1999 07 1999 USE LOW VOC OR WATER BASED PAINT $5,439 $500 Implemented
UD0560 # 02 Y:1999 02 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $31,250 $0 Implemented
UD0560 # 05 Y:1999 05 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $4,300 $0 Implemented
UD0560 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,148 $4,420 Implemented
UD0560 # 07 Y:1999 07 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,789 $330 Implemented
UD0560 # 08 Y:1999 08 1999 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,081 $0 Implemented
UD0560 # 09 Y:1999 09 1999 RECOVER WASTE HEAT FROM EQUIPMENT $784 $1,060 Implemented
UD0560 # 10 Y:1999 10 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $563 $380 Implemented
UD0560 # 11 Y:1999 11 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $494 $0 Implemented
UD0559 # 02 Y:1998 02 1998 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME $13,770 $5,000 Implemented
UD0559 # 05 Y:1998 05 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $3,469 $0 Implemented
UD0559 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,782 $500 Implemented
UD0559 # 09 Y:1998 09 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,288 $0 Implemented
UD0558 # 01 Y:1998 01 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,790 $8,000 Implemented
UD0558 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,343 $45,360 Implemented
UD0558 # 04 Y:1998 04 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,453 $8,000 Implemented
UD0558 # 05 Y:1998 05 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,200 $0 Implemented
UD0557 # 01 Y:1998 01 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $42,942 $12,000 Implemented
UD0557 # 02 Y:1998 02 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $60,203 $0 Implemented
UD0556 # 01 Y:1998 01 1998 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $189,046 $0 Implemented