IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,631

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0549 # 05 Y:1998 05 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $736 $0 Implemented
UD0549 # 06 Y:1998 06 1998 RECOVER WASTE HEAT FROM EQUIPMENT $624 $500 Implemented
UD0548 # 01 Y:1998 01 1998 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $2,243 $0 Implemented
UD0548 # 02 Y:1998 02 1998 SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE $7,607 $720 Implemented
UD0548 # 04 Y:1998 04 1998 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,375 $1,120 Implemented
UD0547 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $228,030 $30,000 Implemented
UD0547 # 03 Y:1998 03 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $181,440 $75,000 Implemented
UD0547 # 04 Y:1998 04 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $19,335 $28,000 Implemented
UD0547 # 06 Y:1998 06 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,918 $0 Implemented
UD0547 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,126 $57,752 Implemented
UD0547 # 08 Y:1998 08 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,849 $500 Implemented
UD0546 # 01 Y:1998 01 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $4,349 $0 Implemented
UD0546 # 02 Y:1998 02 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,580 $0 Implemented
UD0546 # 04 Y:1998 04 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,403 $4,000 Implemented
UD0545 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,984 $10,116 Implemented
UD0544 # 01 Y:1998 01 1998 USE MORE EFFICIENT ADHESIVE APPLICATORS $15,189 $500 Implemented
UD0544 # 03 Y:1998 03 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $8,392 $0 Implemented
UD0544 # 04 Y:1998 04 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,427 $1,000 Implemented
UD0544 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,145 $1,000 Implemented
UD0544 # 06 Y:1998 06 1998 REPAIR FAULTY LOUVERS AND DAMPERS $2,092 $400 Implemented
UD0544 # 07 Y:1998 07 1998 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $2,054 $0 Implemented
UD0544 # 09 Y:1998 09 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $922 $700 Implemented
UD0544 # 10 Y:1998 10 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $769 $0 Implemented
UD0543 # 02 Y:1998 02 1998 EXTEND SOLUTION LIFE WITH FILTERING OR CARBONATE FREEZING $45,731 $4,000 Implemented
UD0543 # 03 Y:1998 03 1998 EXTEND SOLUTION LIFE WITH FILTERING OR CARBONATE FREEZING $21,625 $4,000 Implemented