Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,578
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0280 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,141 | $200 | Implemented |
LM0008 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,518 | $500 | Implemented |
LM0008 # 03 Y:2001 | 03 | 2001 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $787 | $0 | Implemented |
LM0008 # 05 Y:2001 | 05 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $36,000 | $27,600 | Implemented |
LM0008 # 06 Y:2001 | 06 | 2001 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $146,432 | $17,000 | Implemented |
LM0008 # 07 Y:2001 | 07 | 2001 | HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME | $332,648 | $0 | Implemented |
SD0279 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,073 | $1,400 | Implemented |
SD0279 # 06 Y:2001 | 06 | 2001 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $5,667 | $1,000 | Implemented |
SD0279 # 13 Y:2001 | 13 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $322,709 | $20,000 | Implemented |
SF0218 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,973 | $360 | Implemented |
SF0218 # 06 Y:2001 | 06 | 2001 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $4,406 | $4,080 | Implemented |
SF0218 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,754 | $11,785 | Implemented |
SF0215 # 07 Y:2001 | 07 | 2001 | INSTALL OCCUPANCY SENSORS | $6,547 | $14,341 | Implemented |
SF0215 # 11 Y:2001 | 11 | 2001 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $219,121 | $0 | Implemented |
SF0215 # 15 Y:2001 | 15 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $5,003 | $5,111 | Implemented |
SF0215 # 01 Y:2001 | 01 | 2001 | APPLY A PROTECTIVE COATING TO RACKS AND TANKS | $3,452 | $0 | Implemented |
SF0215 # 02 Y:2001 | 02 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,984 | $4,574 | Implemented |
SF0215 # 05 Y:2001 | 05 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $46,103 | $50,000 | Implemented |
SF0215 # 06 Y:2001 | 06 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,758 | $3,291 | Implemented |
LM0006 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,389 | $450 | Implemented |
LM0006 # 07 Y:2001 | 07 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $48,228 | $25,000 | Implemented |
LM0007 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,501 | $630 | Implemented |
LM0007 # 03 Y:2001 | 03 | 2001 | INSTALL SKYLIGHTS | $1,567 | $3,000 | Implemented |
LM0007 # 05 Y:2001 | 05 | 2001 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $26,071 | $150 | Implemented |
LM0007 # 07 Y:2001 | 07 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $29,913 | $29,612 | Implemented |