IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,405

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0047 # 04 Y:2014 04 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,970 $0 Implemented
WM0047 # 09 Y:2014 09 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,932 $2,100 Implemented
WM0047 # 10 Y:2014 10 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,430 $1,180 Implemented
IA0518 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,434 $704 Implemented
IA0518 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,232 $5,280 Implemented
IA0518 # 04 Y:2014 04 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $939 $185 Implemented
IA0518 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $149 $210 Implemented
IA0518 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,190 $8,793 Implemented
IA0518 # 08 Y:2014 08 2014 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $462 $80 Implemented
IA0518 # 09 Y:2014 09 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,803 $2,302 Implemented
WM0045 # 03 Y:2014 03 2014 UPGRADE CONTROLS ON COMPRESSORS $2,701 $0 Implemented
WM0045 # 07 Y:2014 07 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $478 $280 Implemented
WM0045 # 09 Y:2014 09 2014 COVER OPEN TANKS $51 $0 Implemented
WM0045 # 11 Y:2014 11 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,255 $1,220 Implemented
WM0046 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $266 $132 Implemented
WM0046 # 02 Y:2014 02 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $394 $320 Implemented
WM0046 # 03 Y:2014 03 2014 IMPROVE SPACE COMFORT CONDITIONING $5,525 $595 Implemented
WM0044 # 01 Y:2014 01 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $620 $487 Implemented
WM0044 # 03 Y:2014 03 2014 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,297 $0 Implemented
WM0044 # 04 Y:2014 04 2014 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $4,078 $5,000 Implemented
WM0044 # 05 Y:2014 05 2014 USE SYNTHETIC LUBRICANT $3,359 $1,269 Implemented
WM0044 # 06 Y:2014 06 2014 RECOVER WASTE HEAT FROM EQUIPMENT $323 $345 Implemented
WM0044 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $992 $2,434 Implemented
WM0043 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,399 $38,020 Implemented
WM0043 # 02 Y:2014 02 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,588 $0 Implemented