IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,882

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0517 # 04 Y:1999 04 1999 INSTALL OCCUPANCY SENSORS $1,100 $1,950 Implemented
KU0517 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $240 $250 Implemented
KU0516 # 01 Y:1999 01 1999 OPTIMIZE PLANT POWER FACTOR $17,580 $24,400 Implemented
KU0516 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,520 $8,930 Implemented
KU0516 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,770 $670 Implemented
KU0516 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,220 $870 Implemented
KU0516 # 08 Y:1999 08 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $49,760 $35,000 Implemented
KU0515 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,780 $400 Implemented
KU0515 # 04 Y:1999 04 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $530 $0 Implemented
KU0515 # 05 Y:1999 05 1999 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $3,140 $7,830 Implemented
KU0515 # 06 Y:1999 06 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $400,000 $602,110 Implemented
KU0514 # 01 Y:1999 01 1999 USE OPTIMUM TEMPERATURE $25,150 $9,360 Implemented
KU0514 # 03 Y:1999 03 1999 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $2,250 $280 Implemented
KU0514 # 06 Y:1999 06 1999 INSULATE BARE EQUIPMENT $1,120 $860 Implemented
KU0514 # 07 Y:1999 07 1999 MINIMIZE WATER USAGE $12,240 $22,300 Implemented
KU0514 # 09 Y:1999 09 1999 ELIMINATE LEAKS IN WATER LINES AND VALVES $490 $260 Implemented
KU0514 # 10 Y:1999 10 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $106,720 $288,000 Implemented
KU0513 # 01 Y:1999 01 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $166,610 $85,440 Implemented
KU0513 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,800 $700 Implemented
KU0513 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $3,080 $4,830 Implemented
KU0513 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $950 $1,000 Implemented
KU0513 # 06 Y:1999 06 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $1,250 $1,000 Implemented
KU0513 # 07 Y:1999 07 1999 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $23,400 $61,400 Implemented
KU0509 # 01 Y:1998 01 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,070 $0 Implemented
KU0509 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $640 $380 Implemented