IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0550 # 03 Y:2020 03 2020 INSTALL TURBULATORS $3,921 $11,250 Implemented
UF0550 # 04 Y:2020 04 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,928 $2,800 Implemented
UF0550 # 05 Y:2020 05 2020 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $383,788 $897,972 Implemented
MI0370 # 05 Y:2020 05 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,983 $580 Implemented
MI0370 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,663 $120 Implemented
MI0370 # 07 Y:2020 07 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $4,066 $480 Implemented
MI0370 # 08 Y:2020 08 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,834 $1,980 Implemented
MI0370 # 09 Y:2020 09 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,780 $580 Implemented
UF0549 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,001 $2,904 Implemented
UF0548 # 01 Y:2020 01 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $27,216 $0 Implemented
UF0548 # 02 Y:2020 02 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,699 $74,548 Implemented
UF0548 # 03 Y:2020 03 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,062 $2,800 Implemented
UF0548 # 04 Y:2020 04 2020 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $493,101 $1,875,550 Implemented
UF0547 # 01 Y:2020 01 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $234,675 $218,100 Implemented
UF0547 # 02 Y:2020 02 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,816 $17,893 Implemented
UF0547 # 03 Y:2020 03 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,426 $0 Implemented
UF0546 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $40,475 $333,760 Implemented
UF0546 # 03 Y:2020 03 2020 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $5,492 $4,295 Implemented
UF0545 # 01 Y:2020 01 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $67,090 $20,230 Implemented
UF0545 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $51,046 $88,272 Implemented
UF0545 # 03 Y:2020 03 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,536 $0 Implemented
MI0369 # 01 Y:2020 01 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,259 $580 Implemented
MI0369 # 02 Y:2020 02 2020 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $6,954 $7,492 Implemented
MI0369 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,267 $1,980 Implemented
MI0367 # 01 Y:2020 01 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $38,331 $2,480 Implemented