IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0844 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,466 $23,175 Implemented
MA0772 # 06 Y:2017 06 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $499 $20 Implemented
MA0772 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $551 $300 Implemented
MA0772 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,550 $7,200 Implemented
MA0755 # 03 Y:2016 03 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,196 $21,560 Implemented
MA0734 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $338 $300 Implemented
MA0670 # 01 Y:2011 01 2011 INSULATE BARE EQUIPMENT $11,262 $5,845 Implemented
MA0670 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,994 $1,800 Implemented
MA0670 # 02 Y:2011 02 2011 OPTIMIZE PLANT POWER FACTOR $3,931 $7,260 Implemented
MA0618 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,204 $29,875 Implemented
MA0618 # 06 Y:2007 06 2007 INSULATE BARE EQUIPMENT $7,795 $1,924 Implemented
MA0618 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,879 $79,554 Implemented
MA0618 # 03 Y:2007 03 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,316 $3,220 Implemented
MA0618 # 05 Y:2007 05 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,589 $17,740 Implemented
MA0618 # 09 Y:2007 09 2007 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,070 $340 Implemented
MA0618 # 07 Y:2007 07 2007 OPTIMIZE PLANT POWER FACTOR $4,906 $18,500 Implemented
MA0618 # 02 Y:2007 02 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,820 $26,621 Implemented
MA0618 # 08 Y:2007 08 2007 INSTALL TIMERS AND/OR THERMOSTATS $4,125 $3,552 Implemented
MA0604 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,206 $13,536 Implemented
MA0604 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $20,912 $14,335 Implemented
MA0604 # 04 Y:2006 04 2006 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE $8,539 $8,050 Implemented
MA0592 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,338 $3,295 Implemented
MA0592 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,789 $0 Implemented
MA0592 # 02 Y:2006 02 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $56,494 $73,748 Implemented
MA0469 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,374 $1,010 Implemented