IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,695

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0155 # 04 Y:1998 04 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $1,154 $304 Implemented
AR0155 # 03 Y:1998 03 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $43 $0 Implemented
AR0155 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $24 $25 Implemented
AR0155 # 01 Y:1998 01 1998 REPLACE BOILER $2,248 $8,260 Implemented
AM0335 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,790 $250 Implemented
UL0207 # 05 Y:1998 05 1998 $306,800 $117,500 Implemented
UL0207 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,492 $20 Implemented
UL0207 # 01 Y:1998 01 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,709 $120 Implemented
GT0653 # 07 Y:1998 07 1998 $370,000 $100,000 Implemented
GT0653 # 06 Y:1998 06 1998 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $8,980 $31,660 Implemented
GT0653 # 04 Y:1998 04 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $384 $0 Implemented
GT0653 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,810 $600 Implemented
CO0429 # 04 Y:1998 04 1998 $6,000 $10,160 Implemented
CO0429 # 02 Y:1998 02 1998 CLOSELY MONITOR CHEMICAL ADDITIONS TO INCREASE BATH LIFE $4,860 $0 Implemented
CO0429 # 01 Y:1998 01 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $840 $1,000 Implemented
UF0215 # 08 Y:1998 08 1998 $21,106 $0 Implemented
OD0125 # 06 Y:1998 06 1998 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $619 $0 Implemented
OD0125 # 03 Y:1998 03 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,650 $630 Implemented
OD0125 # 02 Y:1998 02 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $704 $840 Implemented
OD0125 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,283 $67,670 Implemented
NC0147 # 01 Y:1998 01 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,282 $200 Implemented
NC0147 # 02 Y:1998 02 1998 RECOVER WASTE HEAT FROM EQUIPMENT $610 $500 Implemented
NC0147 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,356 $4,000 Implemented
NC0147 # 05 Y:1998 05 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $375 $200 Implemented
NC0147 # 06 Y:1998 06 1998 $14,809 $0 Implemented