IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,929

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0656 # 11 Y:2023 11 2023 DEVELOP A REPAIR/REPLACE POLICY $1,896 $8,107 Implemented
WV0656 # 12 Y:2023 12 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,376 $1,500 Implemented
WV0656 # 13 Y:2023 13 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,364 $3,507 Implemented
WV0656 # 14 Y:2023 14 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,191 $1,070 Implemented
UF0606 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,283 $0 Implemented
UF0606 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $35,430 $25,350 Implemented
UF0606 # 03 Y:2023 03 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $38,799 $79,800 Implemented
UF0606 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $65,322 $322,608 Implemented
UF0606 # 01 Y:2023 01 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $188,564 $146,067 Implemented
AS0566 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $29,582 $284,735 Implemented
AS0566 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $1,673 $3,459 Implemented
AS0566 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,411 $463 Implemented
AS0566 # 04 Y:2023 04 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $404 $496 Implemented
AS0566 # 05 Y:2023 05 2023 REDUCE HEAT GAIN BY WINDOW TINTING $193 $667 Implemented
UF0605 # 06 Y:2023 06 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $5,654 $20,000 Implemented
UF0605 # 05 Y:2023 05 2023 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $1,444,605 $0 Implemented
UF0605 # 04 Y:2023 04 2023 IMPROVE COMBUSTION CONTROL CAPABILITY $3,043 $2,800 Implemented
UF0605 # 02 Y:2023 02 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $38,052 $10,000 Implemented
UF0605 # 03 Y:2023 03 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,825 $11,200 Implemented
IP0180 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,621 $36,055 Implemented
IP0180 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,666 $1,830 Implemented
IP0180 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,158 $32 Implemented
IP0180 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,258 $0 Implemented
NL0090 # 01 Y:2023 01 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,602 $19,848 Implemented
NL0090 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,629 $7,670 Implemented