IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,455

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KS2204 # 08 Y:2022 08 2022 COMBINE UTILITY METERS $3,300 $5,000 Not Implemented
KS2204 # 09 Y:2022 09 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,396 $1,600 Not Implemented
MU0004 # 01 Y:2022 01 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,123 $0 Implemented
MU0004 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,089 $4,922 Implemented
MU0004 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $845 $2,773 Implemented
MU0004 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $673 $0 Not Implemented
MU0004 # 05 Y:2022 05 2022 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $250 $0 Implemented
MU0004 # 06 Y:2022 06 2022 COMBINE UTILITY METERS $180 $0 Implemented
MU0004 # 07 Y:2022 07 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $58 $77 Implemented
MZ0332 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,571 $18,580 Implemented
MZ0332 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $87,851 $670,334 Not Implemented
MZ0332 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,554 $7,980 Not Implemented
MZ0332 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,676 $1,330 Implemented
MZ0332 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $506 $780 Not Implemented
MZ0332 # 06 Y:2022 06 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,198 $720 Not Implemented
MZ0332 # 07 Y:2022 07 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,524 $7,544 Not Implemented
MZ0332 # 08 Y:2022 08 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $58,961 $200,000 Implemented
NL0072 # 01 Y:2022 01 2022 REPLACE BOILER $18,966 $23,925 Implemented
NL0072 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,761 $20,400 Implemented
NL0072 # 03 Y:2022 03 2022 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $2,055 $266 Implemented
NL0072 # 04 Y:2022 04 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $773 $1,445 Not Implemented
ORC003 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,122 $37,260 Not Implemented
ORC003 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $683 $3,000 Not Implemented
ORC003 # 03 Y:2022 03 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,529 $72,976 Not Implemented
ORC003 # 04 Y:2022 04 2022 INSTALL TIMERS AND/OR THERMOSTATS $759 $2,250 Not Implemented