IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,455

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0612 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $957 $0 Implemented
SD0612 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,530 $9,245 Not Implemented
SD0612 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,883 $2,800 Not Implemented
SD0612 # 07 Y:2021 07 2021 RECOVER WASTE HEAT FROM EQUIPMENT $14,829 $44,568 Not Implemented
SD0612 # 08 Y:2021 08 2021 REPAIR AND ELIMINATE STEAM LEAKS $557 $1,000 Implemented
WM0164 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,235 $31,198 Not Implemented
WM0164 # 02 Y:2021 02 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $9,078 $94,182 Not Implemented
WM0164 # 03 Y:2021 03 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,588 $7,000 Not Implemented
WM0164 # 04 Y:2021 04 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,231 $14,000 Not Implemented
WM0164 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,300 $3,750 Not Implemented
WM0164 # 06 Y:2021 06 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,833 $1,945 Not Implemented
WM0164 # 07 Y:2021 07 2021 INSTALL OCCUPANCY SENSORS $1,093 $720 Not Implemented
WM0164 # 08 Y:2021 08 2021 USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING $633 $1,500 Not Implemented
WV0611 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $2,448 $734 Implemented
WV0611 # 02 Y:2021 02 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,923 $240 Implemented
WV0611 # 03 Y:2021 03 2021 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,803 $3,254 Implemented
WV0611 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,767 $2,029 Not Implemented
WV0611 # 05 Y:2021 05 2021 DEVELOP A REPAIR/REPLACE POLICY $1,003 $761 Implemented
WV0611 # 06 Y:2021 06 2021 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $830 $4,080 Not Implemented
WV0611 # 07 Y:2021 07 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $244 $1,213 Not Implemented
WV0611 # 08 Y:2021 08 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $191 $29 Implemented
NL0060 # 01 Y:2021 01 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,780 $6,000 Implemented
NL0060 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,978 $8,057 Implemented
NL0060 # 03 Y:2021 03 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $908 $1,790 Implemented
LS2115 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,865 $270 Not Implemented