IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,469

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2114 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,117 $473 Implemented
LS2114 # 07 Y:2021 07 2021 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $66 $50 Not Implemented
LS2114 # 08 Y:2021 08 2021 INSULATE BARE EQUIPMENT $55 $102 Not Implemented
AM0827 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $13,390 $30,920 Implemented
AM0827 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,760 $1,300 Implemented
AM0827 # 03 Y:2021 03 2021 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,630 $0 Implemented
AM0827 # 04 Y:2021 04 2021 PAY UTILITY BILLS ON TIME $1,766 $0 Implemented
AS0512 # 01 Y:2021 01 2021 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $131,005 $500 Implemented
AS0512 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,545 $9,764 Not Implemented
AS0512 # 03 Y:2021 03 2021 INSTALL SKYLIGHTS $3,915 $15,962 Not Implemented
AS0512 # 04 Y:2021 04 2021 KEEP EQUIPMENT CLEAN $3,083 $3,482 Not Implemented
AS0512 # 05 Y:2021 05 2021 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,005 $650 Not Implemented
LS2113 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,608 $50 Not Implemented
LS2113 # 02 Y:2021 02 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,312 $318 Not Implemented
LS2113 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,491 $585 Implemented
LS2113 # 04 Y:2021 04 2021 INSTALL OCCUPANCY SENSORS $2,236 $646 Not Implemented
LS2113 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $40,876 $16,200 Not Implemented
LS2113 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,512 $6,847 Implemented
TT0255 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,816 $1,640 Implemented
TT0255 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $32,997 $1,640 Not Implemented
TT0255 # 03 Y:2021 03 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $20,336 $24,200 Implemented
TT0255 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,140 $7,200 Implemented
UK2105 # 01 Y:2021 01 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $701 $0 n/a
UK2105 # 02 Y:2021 02 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,578 $0 n/a
UK2105 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,309 $2,702 n/a