IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,464

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0114 # 08 Y:2020 08 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,024 $10,137 Not Implemented
CW0114 # 09 Y:2020 09 2020 UPGRADE CONTROLS ON COMPRESSORS $1,244 $110 Not Implemented
CW0114 # 10 Y:2020 10 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $356 $90 Implemented
WV0602 # 01 Y:2020 01 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,049 $3,000 Implemented
WV0602 # 02 Y:2020 02 2020 DIRECT WARMEST AIR TO COMBUSTION INTAKE $4,212 $8,168 Not Implemented
WV0602 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $1,669 $2,886 Implemented
WV0602 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $1,512 $2,197 Implemented
WV0602 # 05 Y:2020 05 2020 UPGRADE CONTROLS ON COMPRESSORS $743 $1,348 Not Implemented
WV0602 # 06 Y:2020 06 2020 UPGRADE CONTROLS ON COMPRESSORS $322 $299 Not Implemented
WV0602 # 07 Y:2020 07 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $268 $1,225 Implemented
WV0602 # 08 Y:2020 08 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $263 $1,060 Implemented
WV0602 # 09 Y:2020 09 2020 DEVELOP A REPAIR/REPLACE POLICY $154 $568 Implemented
WV0602 # 10 Y:2020 10 2020 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $136 $570 Implemented
CO0739 # 01 Y:2020 01 2020 INSTALL OCCUPANCY SENSORS $5,400 $11,069 Not Implemented
CO0739 # 02 Y:2020 02 2020 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,357 $12,500 Not Implemented
CO0739 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $291 $185 Implemented
CO0739 # 04 Y:2020 04 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,067 $0 Implemented
CO0739 # 05 Y:2020 05 2020 INSULATE BARE EQUIPMENT $1,541 $3,605 Not Implemented
CO0739 # 06 Y:2020 06 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,090 $0 Implemented
AM0815 # 01 Y:2020 01 2020 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,330 $4,570 Not Implemented
AM0815 # 02 Y:2020 02 2020 OPTIMIZE PLANT POWER FACTOR $2,600 $3,770 Not Implemented
AM0815 # 03 Y:2020 03 2020 USE SYNTHETIC LUBRICANT $520 $200 Implemented
AM0815 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $210 $200 Not Implemented
UU0176 # 03 Y:2021 03 2021 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $29,753 $10,400 Implemented
UU0176 # 04 Y:2021 04 2021 OPTIMIZE PLANT POWER FACTOR $23,470 $21,270 Not Implemented