IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,592

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0379 # 01 Y:2020 01 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $192,230 $217,000 Implemented
MI0379 # 02 Y:2020 02 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,551 $2,080 Not Implemented
MI0379 # 03 Y:2020 03 2020 USE SOLAR HEAT TO HEAT WATER $9,075 $12,000 Not Implemented
MI0379 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,846 $1,980 Not Implemented
MI0379 # 05 Y:2020 05 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,953 $5,914 Not Implemented
MI0379 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,317 $2,100 Not Implemented
WV0603 # 01 Y:2020 01 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $335,278 $8,838 Not Implemented
WV0603 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $153,514 $84,253 Not Implemented
WV0603 # 03 Y:2020 03 2020 DEVELOP A REPAIR/REPLACE POLICY $11,834 $1,018 Not Implemented
WV0603 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $10,297 $13,192 Not Implemented
WV0603 # 05 Y:2020 05 2020 UPGRADE CONTROLS ON COMPRESSORS $8,141 $1,391 Not Implemented
WV0603 # 06 Y:2020 06 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,058 $3,394 Not Implemented
WV0603 # 07 Y:2020 07 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,613 $30 Not Implemented
WV0603 # 08 Y:2020 08 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,223 $1,300 Not Implemented
WV0603 # 09 Y:2020 09 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $546 $525 Not Implemented
WV0603 # 10 Y:2020 10 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $474 $1,450 Not Implemented
SD0602 # 01 Y:2020 01 2020 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,957 $7,500 Not Implemented
SD0602 # 02 Y:2020 02 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,346 $568 Not Implemented
SD0602 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,898 $2,500 Implemented
SD0602 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,430 $10,300 Not Implemented
SD0602 # 05 Y:2020 05 2020 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,177 $0 Not Implemented
SD0602 # 06 Y:2020 06 2020 REDUCE SCRAP PRODUCTION $68,040 $68,000 Not Implemented
UF0555 # 01 Y:2020 01 2020 INCREASE EFFICIENCY OF TRUCKS $70,950 $336,000 Implemented
UF0555 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,846 $7,217 Implemented
UF0555 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $2,700 $10,047 Implemented