IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

162,359

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0182 # 06 Y:1985 06 1985 MINIMIZE WATER USAGE $38,577 $4,000 Implemented
UD0182 # 07 Y:1985 07 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,516 $2,500 Implemented
TN0263 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,113 $11,950 Implemented
TN0263 # 02 Y:1985 02 1985 INSTALL SET-BACK TIMERS $1,776 $0 Not Implemented
TN0263 # 03 Y:1985 03 1985 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,318 $0 Implemented
TN0244 # 01 Y:1985 01 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,989 $0 Implemented
TN0244 # 02 Y:1985 02 1985 INSTALL SET-BACK TIMERS $1,114 $1,600 Not Implemented
TN0244 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $396 $45 Implemented
TN0252 # 01 Y:1985 01 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,105 $8,772 Implemented
TN0252 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,557 $180 Implemented
TN0252 # 03 Y:1985 03 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,545 $0 Not Implemented
TN0252 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $732 $3,720 Implemented
TN0252 # 05 Y:1985 05 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $675 $0 Not Implemented
KU0181 # 01 Y:1985 01 1985 INSULATE BARE EQUIPMENT $10,210 $1,200 Implemented
KU0181 # 02 Y:1985 02 1985 IMPROVE LUBRICATION PRACTICES $2,813 $750 Implemented
KU0181 # 03 Y:1985 03 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,466 $3,000 Not Implemented
KU0181 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,446 $600 Implemented
KU0181 # 05 Y:1985 05 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $891 $150 Implemented
KU0181 # 06 Y:1985 06 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $260 $0 Not Implemented
KU0181 # 07 Y:1985 07 1985 INSTALL AUTOMATIC STACK DAMPER $688 $700 Not Implemented
KU0181 # 08 Y:1985 08 1985 ELIMINATE LEAKS IN WATER LINES AND VALVES $178 $100 Implemented
KU0175 # 01 Y:1985 01 1985 INSTALL TIMERS AND/OR THERMOSTATS $1,551 $484 Implemented
KU0175 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,405 $2,503 Implemented
KU0175 # 03 Y:1985 03 1985 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $875 $22 Implemented
KU0175 # 04 Y:1985 04 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $576 $0 Implemented