IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

89

matching recommendations
Reset
NAICS 331 Primary Metal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0460 # 08 Y:2015 08 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,062 $3,703 Implemented
SF0460 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,462 $9,228 Implemented
SF0460 # 02 Y:2015 02 2015 REPAIR AND ELIMINATE STEAM LEAKS $5,167 $624 Implemented
SD0454 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,512 $200 Implemented
SD0454 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,236 $2,700 Implemented
SD0454 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $14,303 $13,546 Implemented
SD0412 # 05 Y:2009 05 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,333 $0 Implemented
SD0412 # 03 Y:2009 03 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,233 $13,039 Implemented
SD0412 # 06 Y:2009 06 2009 INSTALL SKYLIGHTS $3,365 $9,170 Implemented
LM0125 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,003 $2,604 Implemented
LM0125 # 03 Y:2007 03 2007 $89,704 $11,000 Implemented
SF0341 # 11 Y:2007 11 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,983 $19,920 Implemented
SF0341 # 09 Y:2007 09 2007 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $51,342 $60,000 Implemented
SF0341 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,585 $1,620 Implemented
SF0341 # 07 Y:2007 07 2007 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $20,686 $15,000 Implemented
SF0341 # 06 Y:2007 06 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,960 $9,373 Implemented
SF0341 # 04 Y:2007 04 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,392 $919 Implemented
SF0341 # 13 Y:2007 13 2007 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $17,456 $0 Implemented
SF0341 # 01 Y:2007 01 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,716 $0 Implemented
SF0341 # 03 Y:2007 03 2007 REPAIR AND ELIMINATE STEAM LEAKS $529 $0 Implemented
LM0124 # 03 Y:2007 03 2007 $151,200 $2,000 Implemented
LM0124 # 01 Y:2007 01 2007 $7,858 $2,500 Implemented
LM0124 # 05 Y:2007 05 2007 $44,787 $1,000 Implemented
LM0124 # 06 Y:2007 06 2007 $34,678 $2,000 Implemented
LM0118 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,104 $425 Implemented