IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0150 # 09 Y:1999 09 1999 $426 $0 Implemented
BD0150 # 07 Y:1999 07 1999 $26,208 $5,000 Implemented
BD0150 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,726 $650 Implemented
BD0150 # 04 Y:1999 04 1999 INSTALL OCCUPANCY SENSORS $3,844 $3,750 Implemented
BD0150 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,905 $1,000 Implemented
BD0150 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,594 $12,790 Implemented
BD0146 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $2,118 $1,200 Implemented
BD0146 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $858 $600 Implemented
BD0143 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,826 $4,650 Implemented
BD0143 # 03 Y:1999 03 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,846 $14,300 Implemented
BD0139 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,947 $28,000 Implemented
BD0139 # 02 Y:1999 02 1999 USE SYNTHETIC LUBRICANT $7,711 $2,400 Implemented
BD0139 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,316 $0 Implemented
BD0139 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $630 $545 Implemented
BD0139 # 08 Y:1999 08 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $275 $410 Implemented
BD0139 # 10 Y:1999 10 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $3,154 $9,500 Implemented
WI0351 # 04 Y:1999 04 1999 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,378 $0 Implemented
WI0351 # 08 Y:1999 08 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,365 $4,374 Implemented
WI0351 # 09 Y:1999 09 1999 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $843 $800 Implemented
WI0351 # 02 Y:1999 02 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $7,993 $0 Implemented
WI0351 # 07 Y:1999 07 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,173 $1,920 Implemented
WI0348 # 01 Y:1999 01 1999 $28,000 $40,000 Implemented
WI0348 # 07 Y:1999 07 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $229 $60 Implemented
WI0348 # 04 Y:1999 04 1999 $1,867 $4,200 Implemented
WI0347 # 02 Y:1999 02 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,386 $0 Implemented