IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0524 # 07 Y:2002 07 2002 INSULATE BARE EQUIPMENT $179 $750 Implemented
MA0524 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $501 $158 Implemented
MA0524 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,117 $2,000 Implemented
MA0525 # 06 Y:2002 06 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $101 $0 Implemented
MA0525 # 04 Y:2002 04 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $582 $200 Implemented
MA0525 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $425 $596 Implemented
MA0525 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $791 $0 Implemented
MA0525 # 01 Y:2002 01 2002 AIR CONDITION ONLY SPACE NECESSARY $10,201 $800 Implemented
MA0522 # 07 Y:2002 07 2002 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $3,709 $1,000 Implemented
MA0523 # 02 Y:2002 02 2002 OPTIMIZE PLANT POWER FACTOR $6,907 $11,770 Implemented
MA0523 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,108 $0 Implemented
MA0523 # 07 Y:2002 07 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $359 $230 Implemented
MA0523 # 06 Y:2002 06 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $467 $250 Implemented
MA0523 # 04 Y:2002 04 2002 $1,510 $0 Implemented
MA0518 # 05 Y:2002 05 2002 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,648 $1,250 Implemented
MA0517 # 06 Y:2002 06 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,140 $5,200 Implemented
MA0517 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,164 $2,500 Implemented
MA0518 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,756 $4,000 Implemented
MA0517 # 08 Y:2002 08 2002 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $853 $1,515 Implemented
MA0517 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $6,349 $9,636 Implemented
MA0517 # 03 Y:2002 03 2002 USE MINIMUM SAFE OVEN VENTILATION $7,427 $2,100 Implemented
MA0517 # 04 Y:2002 04 2002 $6,528 $0 Implemented
MA0517 # 01 Y:2002 01 2002 COVER OPEN TANKS $30,107 $4,262 Implemented
MA0518 # 06 Y:2002 06 2002 INSULATE FEEDWATER TANK $847 $1,000 Implemented
MA0516 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,589 $5,200 Implemented