IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

126

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0530 # 04 Y:1997 04 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $24,402 $0 Implemented
UD0529 # 02 Y:1997 02 1997 COMBINE UTILITY METERS $1,939 $3,357 Implemented
UD0529 # 04 Y:1997 04 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $551 $500 Implemented
UD0529 # 01 Y:1997 01 1997 $4,259 $0 Implemented
UD0528 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,076 $5,818 Implemented
UD0528 # 04 Y:1997 04 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,886 $200 Implemented
UD0528 # 02 Y:1997 02 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,857 $10,000 Implemented
UD0528 # 01 Y:1997 01 1997 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $4,108 $0 Implemented
UD0529 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,396 $200 Implemented
UD0527 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,177 $200 Implemented
UD0526 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,181 $11,751 Implemented
UD0526 # 02 Y:1997 02 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,197 $5,000 Implemented
UD0526 # 01 Y:1997 01 1997 OPTIMIZE PLANT POWER FACTOR $14,725 $15,000 Implemented
UM0095 # 05 Y:1997 05 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $3,511 $3,500 Implemented
UM0095 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $373 $600 Implemented
UM0095 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,423 $1,650 Implemented
UM0095 # 06 Y:1997 06 1997 $6,800 $400 Implemented
UM0094 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $706 $1,185 Implemented
UM0094 # 05 Y:1997 05 1997 INSULATE BARE EQUIPMENT $18,874 $7,590 Implemented
UD0524 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,898 $16,158 Implemented
UD0524 # 05 Y:1997 05 1997 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $5,400 $22,500 Implemented
UD0524 # 02 Y:1997 02 1997 USE OPTIMUM THICKNESS INSULATION $1,914 $9,400 Implemented
UD0524 # 01 Y:1997 01 1997 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $1,145 $0 Implemented
UD0522 # 05 Y:1997 05 1997 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $22,129 $4,000 Implemented
UD0522 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,126 $6,975 Implemented