Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
85
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0584 # 02 Y:1999 | 02 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $998 | $1,200 | Implemented |
UD0584 # 01 Y:1999 | 01 | 1999 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $28,107 | $3,150 | Implemented |
UD0584 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $981 | $356 | Implemented |
UD0583 # 01 Y:1999 | 01 | 1999 | $6,264 | $0 | Implemented | |
UD0582 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,601 | $16,538 | Implemented |
UD0582 # 02 Y:1999 | 02 | 1999 | $38,800 | $0 | Implemented | |
UD0582 # 03 Y:1999 | 03 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $19,416 | $3,300 | Implemented |
UD0581 # 01 Y:1999 | 01 | 1999 | $370,588 | $40,000 | Implemented | |
UM0150 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $680 | $300 | Implemented |
UM0149 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $618 | $200 | Implemented |
UM0149 # 06 Y:1999 | 06 | 1999 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $8,500 | $40,000 | Implemented |
UM0149 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $836 | $500 | Implemented |
UD0580 # 05 Y:1999 | 05 | 1999 | USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER | $27,840 | $3,500 | Implemented |
UD0580 # 06 Y:1999 | 06 | 1999 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $27,804 | $11,744 | Implemented |
UD0580 # 07 Y:1999 | 07 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,051 | $30,337 | Implemented |
UD0579 # 02 Y:1999 | 02 | 1999 | $25,726 | $7,500 | Implemented | |
UD0579 # 03 Y:1999 | 03 | 1999 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $9,050 | $8,000 | Implemented |
UD0579 # 04 Y:1999 | 04 | 1999 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $7,690 | $2,850 | Implemented |
UD0579 # 06 Y:1999 | 06 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $910 | $0 | Implemented |
UM0147 # 05 Y:1999 | 05 | 1999 | RECOVER AND REUSE WASTE MATERIAL | $1,436 | $0 | Implemented |
UD0578 # 01 Y:1999 | 01 | 1999 | $323,997 | $26,940 | Implemented | |
UD0578 # 03 Y:1999 | 03 | 1999 | $19,500 | $8,600 | Implemented | |
UD0578 # 04 Y:1999 | 04 | 1999 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $17,671 | $3,000 | Implemented |
UD0578 # 06 Y:1999 | 06 | 1999 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,242 | $0 | Implemented |
UD0576 # 03 Y:1999 | 03 | 1999 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $10,377 | $4,700 | Implemented |