IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73

matching recommendations
Reset
NAICS 3222 Converted Paper Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0544 # 05 Y:2008 05 2008 PAY UTILITY BILLS ON TIME $6,800 $0 Implemented
AM0501 # 01 Y:2006 01 2006 REPAIR OR REPLACE STEAM TRAPS $13,010 $390 Implemented
AM0501 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,130 $105 Implemented
AM0501 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,370 $500 Implemented
AM0501 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,370 $1,000 Implemented
TA0108 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,530 $11,050 Implemented
TA0108 # 04 Y:2005 04 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $1,590 $0 Implemented
TA0108 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,647 $120 Implemented
TA0108 # 02 Y:2005 02 2005 INSULATE BARE EQUIPMENT $2,910 $495 Implemented
TA0096 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,040 $500 Implemented
TA0071 # 10 Y:2004 10 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $1,150 $340 Implemented
TA0071 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,930 $400 Implemented
TA0071 # 03 Y:2004 03 2004 REPAIR AND ELIMINATE STEAM LEAKS $14,500 $550 Implemented
TA0071 # 01 Y:2004 01 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $18,700 $0 Implemented
TA0064 # 01 Y:2003 01 2003 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $9,350 $1,800 Implemented
TA0064 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,770 $0 Implemented
TA0064 # 05 Y:2003 05 2003 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,740 $520 Implemented
TA0064 # 07 Y:2003 07 2003 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $101 $211 Implemented
TA0063 # 04 Y:2003 04 2003 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $18,000 $11,210 Implemented
TA0063 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $140 $270 Implemented
TA0063 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,730 $17 Implemented
TA0063 # 01 Y:2003 01 2003 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $27,915 $0 Implemented
AM0429 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $500 $200 Implemented