IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0309 # 02 Y:1997 02 1997 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $10,577 $500 Implemented
WI0309 # 05 Y:1997 05 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,518 $0 Implemented
WI0309 # 03 Y:1997 03 1997 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $9,671 $0 Implemented
WI0308 # 01 Y:1997 01 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $36,638 $2,500 Implemented
WI0308 # 08 Y:1997 08 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $216 $90 Implemented
WI0308 # 06 Y:1997 06 1997 USE TIGHT-FITTING LIDS ON MATERIAL CONTAINERS TO REDUCE VOC EMISSIONS $3,726 $1,000 Implemented
WI0308 # 04 Y:1997 04 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $10,950 $0 Implemented
WI0307 # 06 Y:1997 06 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $331 $425 Implemented
WI0307 # 05 Y:1997 05 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $873 $640 Implemented
WI0307 # 04 Y:1997 04 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $721 $0 Implemented
WI0307 # 01 Y:1997 01 1997 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $24,171 $500 Implemented
WI0305 # 07 Y:1997 07 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,234 $740 Implemented
WI0305 # 04 Y:1997 04 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $14,956 $1,000 Implemented
WI0305 # 01 Y:1997 01 1997 $28,500 $4,500 Implemented
WI0301 # 07 Y:1997 07 1997 INSULATE BARE EQUIPMENT $768 $998 Implemented
WI0301 # 03 Y:1997 03 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $10,763 $23,000 Implemented
WI0297 # 05 Y:1997 05 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $261 $0 Implemented
WI0297 # 03 Y:1997 03 1997 RECOVER WASTE HEAT FROM EQUIPMENT $1,100 $150 Implemented
WI0297 # 01 Y:1997 01 1997 $30,000 $36,750 Implemented
WI0296 # 08 Y:1997 08 1997 MINIMIZE WATER USAGE $1,473 $900 Implemented
WI0296 # 06 Y:1997 06 1997 REDUCE VENTILATION AIR $699 $500 Implemented
WI0296 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $725 $1,608 Implemented
WI0296 # 02 Y:1997 02 1997 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,364 $5,400 Implemented
WI0294 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,027 $480 Implemented
WI0294 # 03 Y:1997 03 1997 ELIMINATE/REDUCE AN OPERATION $2,227 $0 Implemented