IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0772 # 06 Y:2023 06 2023 INSULATE BARE EQUIPMENT $1,312 $5,390 Implemented
OR0772 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $1,740 $3,039 Implemented
OR0772 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,514 $8,385 Implemented
OR0706 # 06 Y:2018 06 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $854 $0 Implemented
OR0706 # 04 Y:2018 04 2018 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $8,000 $24,775 Implemented
OR0706 # 01 Y:2018 01 2018 REPAIR AND ELIMINATE STEAM LEAKS $12,552 $1,970 Implemented
OR0670 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $8,978 $1,314 Implemented
OR0670 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $14,066 $10,367 Implemented
OR0670 # 02 Y:2016 02 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $13,371 $5,100 Implemented
OR0651 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $270,822 $210,050 Implemented
OR0651 # 01 Y:2015 01 2015 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $58,422 $9,638 Implemented
OR0540 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $2,932 $13,049 Implemented
OR0540 # 02 Y:2008 02 2008 INCREASE AMOUNT OF CONDENSATE RETURNED $14,149 $6,100 Implemented
OR0540 # 01 Y:2008 01 2008 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $29 $10,000 Implemented
OR0541 # 01 Y:2008 01 2008 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $277,000 $77,500 Implemented
OR0534 # 10 Y:2008 10 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $447 $808 Implemented
OR0534 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $1,219 $2,510 Implemented
OR0534 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $271 $0 Implemented
OR0534 # 04 Y:2008 04 2008 OPTIMIZE PLANT POWER FACTOR $6,768 $6,825 Implemented
OR0534 # 03 Y:2008 03 2008 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $6,794 $0 Implemented
OR0455 # 05 Y:2004 05 2004 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,420 $150 Implemented
OR0455 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $2,140 $1,750 Implemented
OR0455 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,570 $0 Implemented
OR0455 # 01 Y:2004 01 2004 RECOVER AND REUSE WASTE MATERIAL $45,100 $16,200 Implemented