IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
NAICS 3251 Basic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0859 # 06 Y:2022 06 2022 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,650 $160 Implemented
AM0859 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $355,500 $15,000 Implemented
AM0734 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,630 $16,030 Implemented
AM0734 # 03 Y:2017 03 2017 REPAIR AND ELIMINATE STEAM LEAKS $49,030 $30,000 Implemented
AM0711 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,350 $57,195 Implemented
AM0711 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,630 $9,030 Implemented
AM0711 # 08 Y:2016 08 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,880 $0 Implemented
AM0676 # 05 Y:2015 05 2015 REPAIR AND ELIMINATE STEAM LEAKS $7,850 $4,000 Implemented
AM0676 # 01 Y:2015 01 2015 REPAIR OR REPLACE STEAM TRAPS $54,800 $13,155 Implemented
AM0651 # 06 Y:2014 06 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,950 $0 Implemented
AM0651 # 05 Y:2014 05 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,725 $500 Implemented
AM0651 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,745 $735 Implemented
AM0651 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,180 $1,500 Implemented
AM0651 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $8,525 $400 Implemented
AM0651 # 01 Y:2014 01 2014 RECOVER WASTE HEAT FROM EQUIPMENT $8,615 $1,485 Implemented
AM0594 # 05 Y:2011 05 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $650 $270 Implemented
AM0594 # 02 Y:2011 02 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,850 $0 Implemented
AM0516 # 06 Y:2006 06 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $430 $0 Implemented
AM0516 # 01 Y:2006 01 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,530 $500 Implemented
AM0516 # 02 Y:2006 02 2006 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $31,494 $12,000 Implemented
AM0516 # 03 Y:2006 03 2006 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $30,123 $12,050 Implemented
AM0516 # 04 Y:2006 04 2006 REPAIR AND ELIMINATE STEAM LEAKS $4,570 $1,000 Implemented
OK0718 # 07 Y:2005 07 2005 USE OPTIMUM THICKNESS INSULATION $2,162 $1,710 Implemented
OK0718 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $1,343 $1,693 Implemented
OK0718 # 01 Y:2005 01 2005 DEVELOP A REPAIR/REPLACE POLICY $12,970 $500 Implemented