IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,185

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0254 # 07 Y:2007 07 2007 PREHEAT COMBUSTION AIR WITH WASTE HEAT $25,275 $12,148 Implemented
SU0254 # 08 Y:2007 08 2007 INSTALL OCCUPANCY SENSORS $24,092 $13,688 Implemented
SU0254 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $73,567 $63,450 Implemented
SU0254 # 11 Y:2007 11 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,604 $6,140 Implemented
SU0254 # 12 Y:2007 12 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $694 $909 Implemented
NC0356 # 02 Y:2007 02 2007 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $20,393 $10,000 Implemented
NC0356 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,456 $100 Implemented
NC0352 # 01 Y:2007 01 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $28,336 $8,000 Implemented
NC0352 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,127 $50 Implemented
NC0352 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $784 $1,000 Implemented
NC0352 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $721 $100 Implemented
LL0264 # 01 Y:2007 01 2007 INSULATE BARE EQUIPMENT $818,045 $90,421 Implemented
LL0264 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $243,412 $19,445 Implemented
LL0264 # 03 Y:2007 03 2007 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $53,421 $607 Implemented
LL0264 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,045 $3,640 Implemented
LL0264 # 05 Y:2007 05 2007 USE PHOTOCELL CONTROLS $12,108 $780 Implemented
LL0264 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,490 $30 Implemented
LL0264 # 11 Y:2007 11 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $534 $388 Implemented
OR0504 # 01 Y:2006 01 2006 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $64,300 $20,000 Implemented
OR0504 # 02 Y:2006 02 2006 REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS $22,500 $44,500 Implemented
OR0504 # 05 Y:2006 05 2006 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $23,000 $0 Implemented
WV0348 # 01 Y:2006 01 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $22,813 $25,350 Implemented
WV0348 # 02 Y:2006 02 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $14,538 $3,000 Implemented
WV0348 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,642 $8,678 Implemented
WV0348 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,260 $0 Implemented