IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

133

matching recommendations
Reset
NAICS 331221 Rolled Steel Shape Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0523 # 12 Y:2014 12 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,179 $50 Implemented
NC0523 # 11 Y:2014 11 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,120 $1,000 Implemented
NC0523 # 13 Y:2014 13 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,803 $1,935 Implemented
SD0454 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,236 $2,700 Implemented
SD0454 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,512 $200 Implemented
SD0454 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $14,303 $13,546 Implemented
LE0332 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,829 $40 Implemented
LE0332 # 07 Y:2012 07 2012 DEVELOP STANDARD OPERATING PROCEDURES $6,689 $0 Implemented
MA0676 # 05 Y:2011 05 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $593 $1,250 Implemented
MA0676 # 01 Y:2011 01 2011 OPTIMIZE PLANT POWER FACTOR $204,367 $98,845 Implemented
MA0676 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $1,721 $2,750 Implemented
UD0817 # 13 Y:2010 13 2010 INSULATE BARE EQUIPMENT $21,893 $0 Implemented
UD0817 # 15 Y:2010 15 2010 INSULATE BARE EQUIPMENT $3,996 $0 Implemented
UD0817 # 12 Y:2010 12 2010 COVER OPEN TANKS $10,386 $0 Implemented
UD0817 # 11 Y:2010 11 2010 USE OPTIMUM TEMPERATURE $8,137 $0 Implemented
UD0817 # 09 Y:2010 09 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,120 $0 Implemented
UD0817 # 07 Y:2010 07 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $628 $0 Implemented
UD0817 # 01 Y:2010 01 2010 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $66,672 $600 Implemented
OK0785 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $563 $0 Implemented
OK0785 # 01 Y:2010 01 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,282 $55,440 Implemented
OK0785 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,602 $0 Implemented
LE0283 # 24 Y:2009 24 2009 INSTALL OCCUPANCY SENSORS $550 $600 Implemented
LE0283 # 23 Y:2009 23 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,799 $32,466 Implemented
LE0283 # 12 Y:2009 12 2009 COVER OPEN TANKS $9,339 $10,000 Implemented
LE0283 # 11 Y:2009 11 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $18,031 $30,000 Implemented