Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
124
matching recommendationsNAICS | 332216 | Saw Blade and Handtool Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0401 # 07 Y:2010 | 07 | 2010 | INSTALL OCCUPANCY SENSORS | $5,761 | $3,750 | Implemented |
MA0651 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,340 | $96,800 | Implemented |
MA0651 # 03 Y:2009 | 03 | 2009 | REPLACE BOILER | $10,080 | $30,700 | Implemented |
MA0648 # 04 Y:2009 | 04 | 2009 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $36,798 | $150,000 | Implemented |
MA0648 # 07 Y:2009 | 07 | 2009 | COVER OPEN TANKS | $5,857 | $1,924 | Implemented |
BD0356 # 04 Y:2009 | 04 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,486 | $0 | Implemented |
BD0356 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,914 | $300 | Implemented |
BD0356 # 06 Y:2009 | 06 | 2009 | USE SYNTHETIC LUBRICANT | $1,494 | $300 | Implemented |
BD0356 # 07 Y:2009 | 07 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $17,823 | $43,280 | Implemented |
WV0374 # 01 Y:2008 | 01 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,144 | $12,730 | Implemented |
WV0374 # 02 Y:2008 | 02 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $15,831 | $2,213 | Implemented |
WV0374 # 03 Y:2008 | 03 | 2008 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,994 | $4,500 | Implemented |
WV0374 # 04 Y:2008 | 04 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $7,339 | $1,076 | Implemented |
WV0374 # 06 Y:2008 | 06 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,079 | $6,378 | Implemented |
WV0374 # 08 Y:2008 | 08 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,513 | $315 | Implemented |
WV0373 # 08 Y:2008 | 08 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $581 | $336 | Implemented |
UF0372 # 01 Y:2005 | 01 | 2005 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $22,802 | $2,143 | Implemented |
UF0372 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,373 | $10,886 | Implemented |
UF0372 # 03 Y:2005 | 03 | 2005 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $2,383 | $0 | Implemented |
UF0372 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,223 | $16,223 | Implemented |
UF0372 # 11 Y:2005 | 11 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,054 | $4,144 | Implemented |
UF0372 # 12 Y:2005 | 12 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,916 | $15,057 | Implemented |
UF0372 # 14 Y:2005 | 14 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,074,880 | $989 | Implemented |
LE0225 # 02 Y:2005 | 02 | 2005 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $17,500 | $50,000 | Implemented |
LE0225 # 04 Y:2005 | 04 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,707 | $200 | Implemented |