Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
66
matching recommendationsSIC | 209 | Misc. Food And Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0749 # 03 Y:2022 | 03 | 2022 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $3,003 | $11,329 | Implemented |
OR0749 # 04 Y:2022 | 04 | 2022 | REPLACE BOILER | $122,100 | $1,640,000 | Implemented |
OR0749 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $999 | $0 | Implemented |
OR0744 # 02 Y:2021 | 02 | 2021 | OPTIMIZE PLANT POWER FACTOR | $15,238 | $36,792 | Implemented |
OR0744 # 03 Y:2021 | 03 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $16,963 | $2,340 | Implemented |
OR0744 # 05 Y:2021 | 05 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,065 | $18,105 | Implemented |
OR0744 # 01 Y:2021 | 01 | 2021 | MINIMIZE WATER USAGE | $2,348 | $0 | Implemented |
OR0742 # 02 Y:2021 | 02 | 2021 | REDESIGN PROCESS | $3,895 | $0 | Implemented |
OR0742 # 01 Y:2021 | 01 | 2021 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,010 | $0 | Implemented |
OR0599 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,611 | $12,467 | Implemented |
OR0599 # 02 Y:2012 | 02 | 2012 | INSTALL AUTOMATIC PACKING EQUIPMENT | $35,308 | $0 | Implemented |
OR0599 # 04 Y:2012 | 04 | 2012 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,409 | $0 | Implemented |
OR0387 # 05 Y:2001 | 05 | 2001 | $57,000 | $74,000 | Implemented | |
OR0387 # 09 Y:2001 | 09 | 2001 | REUSE / RECYCLE/ SELL RUBBER PRODUCTS | $2,320 | $0 | Implemented |
OR0387 # 08 Y:2001 | 08 | 2001 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $1,885 | $300 | Implemented |
OR0387 # 02 Y:2001 | 02 | 2001 | $440,800 | $128,700 | Implemented | |
OR0387 # 06 Y:2001 | 06 | 2001 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,800 | $5,850 | Implemented |
OR0387 # 01 Y:2001 | 01 | 2001 | $176,000 | $5,000 | Implemented | |
OR0385 # 03 Y:2000 | 03 | 2000 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $7,231 | $600 | Implemented |
OR0385 # 05 Y:2000 | 05 | 2000 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,380 | $0 | Implemented |
OR0385 # 07 Y:2000 | 07 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,638 | $10,431 | Implemented |
OR0359 # 02 Y:1999 | 02 | 1999 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,013 | $0 | Implemented |
OR0358 # 04 Y:1999 | 04 | 1999 | ELIMINATE A BY-PRODUCT | $9,905 | $2,000 | Implemented |
OR0357 # 05 Y:1999 | 05 | 1999 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $7,150 | $0 | Implemented |
OR0357 # 06 Y:1999 | 06 | 1999 | OPTIMIZE PLANT POWER FACTOR | $1,621 | $4,800 | Implemented |