IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
Reset
SIC 2092 Fresh Or Frozen Prepared Fish
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0742 # 02 Y:2021 02 2021 REDESIGN PROCESS $3,895 $0 Implemented
OR0742 # 01 Y:2021 01 2021 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,010 $0 Implemented
OR0599 # 04 Y:2012 04 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,409 $0 Implemented
OR0599 # 02 Y:2012 02 2012 INSTALL AUTOMATIC PACKING EQUIPMENT $35,308 $0 Implemented
OR0599 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,611 $12,467 Implemented
OR0387 # 02 Y:2001 02 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $440,800 $128,700 Implemented
OR0387 # 01 Y:2001 01 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $176,000 $5,000 Implemented
OR0387 # 05 Y:2001 05 2001 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $57,000 $74,000 Implemented
OR0387 # 06 Y:2001 06 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,800 $5,850 Implemented
OR0387 # 08 Y:2001 08 2001 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,885 $300 Implemented
OR0387 # 09 Y:2001 09 2001 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $2,320 $0 Implemented
OR0385 # 07 Y:2000 07 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,638 $10,431 Implemented
OR0385 # 05 Y:2000 05 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,380 $0 Implemented
OR0385 # 03 Y:2000 03 2000 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $7,231 $600 Implemented
OR0359 # 02 Y:1999 02 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,013 $0 Implemented
OR0358 # 04 Y:1999 04 1999 ELIMINATE A BY-PRODUCT $9,905 $2,000 Implemented
OR0357 # 06 Y:1999 06 1999 OPTIMIZE PLANT POWER FACTOR $1,621 $4,800 Implemented
OR0357 # 05 Y:1999 05 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $7,150 $0 Implemented
OR0215 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $201 $641 Implemented
OR0215 # 05 Y:1994 05 1994 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $652 $500 Implemented
OR0213 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $388 $2,028 Implemented
OR0033 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $260 $295 Implemented
OR0033 # 04 Y:1988 04 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $575 $878 Implemented
OR0033 # 03 Y:1988 03 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $279 $167 Implemented
OR0033 # 02 Y:1988 02 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,744 $300 Implemented