IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

149

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0565 # 01 Y:2004 01 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $216,000 $125,000 Implemented
MA0565 # 02 Y:2004 02 2004 $57,540 $40,000 Implemented
MA0565 # 04 Y:2004 04 2004 REPLACE BOILER $2,760 $750 Implemented
MA0565 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $2,705 $754 Implemented
MA0565 # 06 Y:2004 06 2004 INSULATE FEEDWATER TANK $873 $300 Implemented
MA0500 # 08 Y:2001 08 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,264 $2,000 Implemented
MA0500 # 04 Y:2001 04 2001 OPTIMIZE PLANT POWER FACTOR $14,725 $35,000 Implemented
ME0305 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $396 $1,193 Implemented
ME0305 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,013 $340 Implemented
ME0305 # 06 Y:2000 06 2000 AUTOMATE FINISHING PROCESS $15,000 $41,800 Implemented
ME0305 # 03 Y:2000 03 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $366 $357 Implemented
ME0305 # 05 Y:2000 05 2000 MINIMIZE WATER USAGE $325 $225 Implemented
ME0298 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,392 $340 Implemented
ME0298 # 01 Y:2000 01 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,240 $66,900 Implemented
ME0292 # 08 Y:2000 08 2000 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $310 $240 Implemented
ME0292 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,822 $340 Implemented
ME0292 # 14 Y:2000 14 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $40 $0 Implemented
ME0291 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,828 $160 Implemented
ME0291 # 06 Y:2000 06 2000 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $694 $160 Implemented
ME0291 # 03 Y:2000 03 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $3,294 $4,112 Implemented
ME0285 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,698 $16,582 Implemented
ME0285 # 02 Y:2000 02 2000 USE ONLY AMOUNT OF PACKAGING MATERIAL NECESSARY $3,500 $0 Implemented
ME0285 # 04 Y:2000 04 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $706 $1,772 Implemented
ME0285 # 05 Y:2000 05 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $339 $600 Implemented
ME0271 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $224 $100 Implemented