IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

237

matching recommendations
Reset
SIC 243 Millwork, Plywood & Structural
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0785 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $323 $0 Implemented
OR0761 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,913 $1,078 Implemented
OR0761 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,934 $9,934 Implemented
OR0739 # 01 Y:2021 01 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,888 $0 Implemented
OR0728 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,008 $0 Implemented
OR0727 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,870 $19,006 Implemented
OR0727 # 04 Y:2019 04 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,255 $770 Implemented
OR0658 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $680,062 $427,000 Implemented
OR0658 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $54,203 $59,203 Implemented
OR0639 # 01 Y:2014 01 2014 IMPROVE COMBUSTION CONTROL CAPABILITY $14,677 $12,315 Implemented
OR0639 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $7,377 $7,643 Implemented
OR0639 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,461 $360 Implemented
OR0638 # 07 Y:2014 07 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $21,180 $10,000 Implemented
OR0638 # 04 Y:2014 04 2014 MINIMIZE WATER USAGE $1,003 $0 Implemented
OR0628 # 07 Y:2014 07 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,718 $2,460 Implemented
OR0617 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $5,516 $13,850 Implemented
OR0617 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,239 $20,000 Implemented
OR0617 # 03 Y:2013 03 2013 UPGRADE CONTROLS ON COMPRESSORS $21,219 $131,114 Implemented
OR0617 # 02 Y:2013 02 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,455 $4,610 Implemented
OR0617 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,848 $60,000 Implemented
OR0617 # 06 Y:2013 06 2013 OPTIMIZE PLANT POWER FACTOR $8,494 $35,187 Implemented
OR0590 # 02 Y:2012 02 2012 USE OPTIMUM TEMPERATURE $3,137 $0 Implemented
OR0574 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,450 $7,166 Implemented
OR0573 # 05 Y:2011 05 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $11,543 $7,806 Implemented
OR0567 # 01 Y:2011 01 2011 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $2,000 $1,510 Implemented