IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

349

matching recommendations
Reset
SIC 2851 Paints And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0236 # 12 Y:2003 12 2003 INSTALL AUTOMATIC PACKING EQUIPMENT $89,455 $99,000 Implemented
LE0132 # 02 Y:2002 02 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $675 $130 Implemented
LE0132 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,409 $0 Implemented
UM0188 # 05 Y:2001 05 2001 INSTALL AN UNINTERUPTABLE POWER SUPPLY $3,333 $1,500 Implemented
OK0613 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,071 $4,000 Implemented
OK0613 # 03 Y:2001 03 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $456 $2,600 Implemented
NC0211 # 01 Y:2001 01 2001 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $23,426 $20,000 Implemented
NC0211 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,719 $800 Implemented
NC0211 # 03 Y:2001 03 2001 USE MINIMUM STEAM OPERATING PRESSURE $2,014 $250 Implemented
NC0211 # 04 Y:2001 04 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,453 $6,000 Implemented
NC0211 # 06 Y:2001 06 2001 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,631 $0 Implemented
MA0481 # 01 Y:2001 01 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $17,820 $30,000 Implemented
MA0481 # 02 Y:2001 02 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,390 $5,500 Implemented
MA0481 # 04 Y:2001 04 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,370 $7,000 Implemented
MA0481 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $910 $1,315 Implemented
MA0481 # 07 Y:2001 07 2001 INSULATE FEEDWATER TANK $375 $1,000 Implemented
ME0300 # 05 Y:2000 05 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $5,600 $9,000 Implemented
WI0374 # 03 Y:2000 03 2000 MODIFY WORKLOAD $34,000 $2,000 Implemented
WI0374 # 07 Y:2000 07 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,711 $8,000 Implemented
WI0374 # 08 Y:2000 08 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,394 $500 Implemented
WI0374 # 10 Y:2000 10 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $514 $120 Implemented
WI0374 # 12 Y:2000 12 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $426 $2,040 Implemented
SD0235 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,218 $23,830 Implemented
SD0235 # 11 Y:1999 11 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $21,793 $0 Implemented
SD0235 # 13 Y:1999 13 1999 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $3,960 $0 Implemented