Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
349
matching recommendationsSIC | 2851 | Paints And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0236 # 12 Y:2003 | 12 | 2003 | INSTALL AUTOMATIC PACKING EQUIPMENT | $89,455 | $99,000 | Implemented |
LE0132 # 02 Y:2002 | 02 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $675 | $130 | Implemented |
LE0132 # 06 Y:2002 | 06 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,409 | $0 | Implemented |
UM0188 # 05 Y:2001 | 05 | 2001 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $3,333 | $1,500 | Implemented |
OK0613 # 02 Y:2001 | 02 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,071 | $4,000 | Implemented |
OK0613 # 03 Y:2001 | 03 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $456 | $2,600 | Implemented |
NC0211 # 01 Y:2001 | 01 | 2001 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $23,426 | $20,000 | Implemented |
NC0211 # 02 Y:2001 | 02 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,719 | $800 | Implemented |
NC0211 # 03 Y:2001 | 03 | 2001 | USE MINIMUM STEAM OPERATING PRESSURE | $2,014 | $250 | Implemented |
NC0211 # 04 Y:2001 | 04 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,453 | $6,000 | Implemented |
NC0211 # 06 Y:2001 | 06 | 2001 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,631 | $0 | Implemented |
MA0481 # 01 Y:2001 | 01 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $17,820 | $30,000 | Implemented |
MA0481 # 02 Y:2001 | 02 | 2001 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $10,390 | $5,500 | Implemented |
MA0481 # 04 Y:2001 | 04 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,370 | $7,000 | Implemented |
MA0481 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $910 | $1,315 | Implemented |
MA0481 # 07 Y:2001 | 07 | 2001 | INSULATE FEEDWATER TANK | $375 | $1,000 | Implemented |
ME0300 # 05 Y:2000 | 05 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $5,600 | $9,000 | Implemented |
WI0374 # 03 Y:2000 | 03 | 2000 | MODIFY WORKLOAD | $34,000 | $2,000 | Implemented |
WI0374 # 07 Y:2000 | 07 | 2000 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $2,711 | $8,000 | Implemented |
WI0374 # 08 Y:2000 | 08 | 2000 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,394 | $500 | Implemented |
WI0374 # 10 Y:2000 | 10 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $514 | $120 | Implemented |
WI0374 # 12 Y:2000 | 12 | 2000 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $426 | $2,040 | Implemented |
SD0235 # 04 Y:1999 | 04 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,218 | $23,830 | Implemented |
SD0235 # 11 Y:1999 | 11 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $21,793 | $0 | Implemented |
SD0235 # 13 Y:1999 | 13 | 1999 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $3,960 | $0 | Implemented |