IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,519

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0271 # 01 Y:2001 01 2001 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $9,184 $50 Implemented
UF0271 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,027 $2,302 Implemented
UF0271 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,553 $220 Implemented
UF0271 # 06 Y:2001 06 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,725 $14,788 Implemented
UF0271 # 08 Y:2001 08 2001 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $5,285 $75 Implemented
UF0271 # 10 Y:2001 10 2001 IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM $282 $260 Implemented
UF0271 # 11 Y:2001 11 2001 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $2,958 $6,000 Implemented
SD0273 # 03 Y:2001 03 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,519 $2,000 Implemented
SD0273 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $822 $200 Implemented
SD0273 # 05 Y:2001 05 2001 UPGRADE OBSOLETE EQUIPMENT $5,286 $15,000 Implemented
SD0273 # 07 Y:2001 07 2001 USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) $3,043 $500 Implemented
SD0273 # 08 Y:2001 08 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $4,000 $3,500 Implemented
LE0103 # 03 Y:2001 03 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,154 $1,600 Implemented
LE0103 # 04 Y:2001 04 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,904 $12,900 Implemented
LE0103 # 06 Y:2001 06 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $17,100 $12,300 Implemented
LE0102 # 05 Y:2001 05 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $6,500 $0 Implemented
SU0101 # 01 Y:2001 01 2001 RECYCLE CASTING SAND $35,529 $45,000 Implemented
SU0101 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $370 $0 Implemented
UM0182 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $568 $375 Implemented
UM0182 # 03 Y:2001 03 2001 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $57,900 $28,900 Implemented
UM0179 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,864 $450 Implemented
UM0179 # 06 Y:2001 06 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,286 $500 Implemented
WV0206 # 02 Y:2001 02 2001 USE SYNTHETIC LUBRICANT $120 $118 Implemented
WV0206 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $420 $80 Implemented
WV0206 # 04 Y:2001 04 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,671 $763 Implemented