IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

895

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0120 # 04 Y:2001 04 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $22,381 $0 Implemented
LE0120 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $2,562 $200 Implemented
LL0116 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,494 $1,440 Implemented
LL0116 # 04 Y:2001 04 2001 INSULATE BARE EQUIPMENT $16,464 $3,385 Implemented
LL0116 # 05 Y:2001 05 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,464 $0 Implemented
UM0185 # 01 Y:2001 01 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,400 $600 Implemented
UM0185 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,546 $450 Implemented
UM0185 # 05 Y:2001 05 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $50,525 $10,000 Implemented
LE0102 # 05 Y:2001 05 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $6,500 $0 Implemented
UM0171 # 06 Y:2000 06 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $187,954 $165,000 Implemented
GT0698 # 01 Y:2000 01 2000 INSULATE BARE EQUIPMENT $7,360 $3,240 Implemented
GT0698 # 03 Y:2000 03 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,389 $250 Implemented
GT0698 # 06 Y:2000 06 2000 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $59,243 $300,000 Implemented
GT0698 # 07 Y:2000 07 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,235 $1,800 Implemented
AM0378 # 01 Y:2000 01 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $21,982 $6,500 Implemented
AM0378 # 02 Y:2000 02 2000 OPTIMIZE PLANT POWER FACTOR $18,650 $39,500 Implemented
AM0378 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,660 $500 Implemented
AM0378 # 04 Y:2000 04 2000 SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED $13,630 $699 Implemented
AM0378 # 05 Y:2000 05 2000 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $11,000 $1,350 Implemented
AM0378 # 07 Y:2000 07 2000 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $4,000 $0 Implemented
AM0378 # 08 Y:2000 08 2000 SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM $3,610 $0 Implemented
AM0378 # 09 Y:2000 09 2000 PAY BILLS ON TIME TO AVOID LATE FEES $2,450 $0 Implemented
AM0378 # 11 Y:2000 11 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $2,310 $2,800 Implemented
IA0256 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,685 $100 Implemented
IA0256 # 06 Y:2000 06 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,621 $135 Implemented