IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

286

matching recommendations
Reset
SIC 3317 Steel Pipe And Tubes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0813 # 09 Y:2011 09 2011 INSULATE BARE EQUIPMENT $1,037 $190 Implemented
OK0813 # 11 Y:2011 11 2011 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,447 $25,472 Implemented
AM0567 # 02 Y:2009 02 2009 MODIFY WORKLOAD $3,265 $500 Implemented
AM0567 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $668 $305 Implemented
DL0041 # 07 Y:2009 07 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,000 $348 Implemented
DL0041 # 09 Y:2009 09 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,779 $3,858 Implemented
DL0041 # 05 Y:2009 05 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $3,520 $400 Implemented
DL0041 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $4,029 $1,430 Implemented
DL0041 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,474 $10,800 Implemented
MS0337 # 01 Y:2009 01 2009 COVER OPEN TANKS $284,008 $8,869 Implemented
BD0333 # 01 Y:2007 01 2007 INSTALL OCCUPANCY SENSORS $1,570 $901 Implemented
BD0333 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $376 $476 Implemented
BD0333 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $378 $2 Implemented
BD0333 # 06 Y:2007 06 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $819 $526 Implemented
IC0094 # 03 Y:2005 03 2005 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $24,437 $32,056 Implemented
LE0207 # 07 Y:2005 07 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $851 $500 Implemented
LE0207 # 06 Y:2005 06 2005 INSTALL TIMERS AND/OR THERMOSTATS $1,341 $500 Implemented
LE0207 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,115 $1,000 Implemented
LE0207 # 03 Y:2005 03 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $21,328 $8,300 Implemented
IC0094 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,623 $3,900 Implemented
LE0207 # 01 Y:2005 01 2005 REPLACE BOILER $109,438 $9,760 Implemented
WI0476 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,141 $640 Implemented
WI0476 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,557 $4,280 Implemented
WI0476 # 06 Y:2004 06 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,148 $0 Implemented
LL0192 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,708 $2,585 Implemented