IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

250

matching recommendations
Reset
SIC 3357 Nonferrous Wiredrawing & Insulating
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0721 # 01 Y:2005 01 2005 RECOVER MECHANICAL ENERGY $206,969 $413,938 Implemented
UD0721 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,010 $86,100 Implemented
UD0721 # 03 Y:2005 03 2005 REPAIR AND ELIMINATE STEAM LEAKS $11,745 $160 Implemented
UD0721 # 04 Y:2005 04 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,579 $12,000 Implemented
UD0721 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,580 $0 Implemented
UD0721 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,040 $11,100 Implemented
NC0309 # 01 Y:2005 01 2005 ADD ADDITIONAL PRODUCTION SHIFT $89,630 $5,000 Implemented
NC0309 # 02 Y:2005 02 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,148 $21,000 Implemented
NC0309 # 04 Y:2005 04 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,268 $6,500 Implemented
NC0309 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,767 $100 Implemented
MA0537 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,446 $10,396 Implemented
MA0537 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $464 $150 Implemented
MA0537 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $154 $0 Implemented
BD0214 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,378 $700 Implemented
BD0214 # 09 Y:2002 09 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $222 $215 Implemented
MS0195 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,494 $1,000 Implemented
MS0195 # 05 Y:2001 05 2001 INSTALL TIMERS AND/OR THERMOSTATS $74 $119 Implemented
UL0237 # 02 Y:1999 02 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $11,512 $0 Implemented
UL0227 # 05 Y:1999 05 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $5,430 $1,799 Implemented
TN0661 # 01 Y:1999 01 1999 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $175,335 $5,000 Implemented
TN0661 # 06 Y:1999 06 1999 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $25,103 $30,600 Implemented
UL0207 # 01 Y:1998 01 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,709 $120 Implemented
UL0207 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,492 $20 Implemented
UL0207 # 05 Y:1998 05 1998 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $306,800 $117,500 Implemented
MS0120 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,885 $881 Implemented