IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

457

matching recommendations
Reset
SIC 339 Miscellaneous Primary Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0180 # 03 Y:2004 03 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,884 $0 Implemented
SU0180 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $964 $0 Implemented
SU0180 # 06 Y:2004 06 2004 ADD AREA LIGHTING SWITCHES $291 $680 Implemented
SU0176 # 02 Y:2004 02 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $19,192 $4,348 Implemented
SU0176 # 03 Y:2004 03 2004 USE MAGNETIC TECHNOLOGY TO TREAT WATER $2,160 $939 Implemented
SU0176 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $934 $434 Implemented
UD0686 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $620 $240 Implemented
UD0686 # 08 Y:2004 08 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $392 $450 Implemented
UD0686 # 09 Y:2004 09 2004 PAY BILLS ON TIME TO AVOID LATE FEES $285 $0 Implemented
IC0064 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,084 $36,178 Implemented
LE0165 # 01 Y:2003 01 2003 INSULATE BARE EQUIPMENT $8,970 $1,440 Implemented
LE0165 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $468 $0 Implemented
IC0063 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,141 $4,800 Implemented
IC0063 # 03 Y:2003 03 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $5,935 $0 Implemented
UM0234 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $71,900 $180,000 Implemented
UM0234 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,603 $120,000 Implemented
IC0044 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,388 $10,093 Implemented
IC0044 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,542 $12,107 Implemented
IC0044 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $845 $1,327 Implemented
IC0044 # 04 Y:2002 04 2002 DISCONNECT BALLASTS $162 $213 Implemented
IC0044 # 06 Y:2002 06 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $610 $534 Implemented
IC0044 # 07 Y:2002 07 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,860 $0 Implemented
LM0045 # 03 Y:2002 03 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,903 $0 Implemented
LM0045 # 04 Y:2002 04 2002 USE EVAPORATION TO CONCENTRATE MATERIAL $3,478 $5,500 Implemented
LM0045 # 05 Y:2002 05 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $37,050 $11,250 Implemented