IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,255

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0154 # 05 Y:2000 05 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $3,521 $1,336 Implemented
DS0154 # 06 Y:2000 06 2000 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $4,884 $0 Implemented
HO0220 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $2,415 $1,000 Implemented
HO0220 # 03 Y:2000 03 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $449 $221 Implemented
HO0220 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,955 $600 Implemented
HO0220 # 06 Y:2000 06 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $1,181 $120 Implemented
AM0363 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,540 $500 Implemented
AM0363 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $1,245 $210 Implemented
AM0363 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $470 $215 Implemented
WI0362 # 05 Y:2000 05 2000 TREAT AND REUSE RINSE WATERS $3,598 $6,375 Implemented
TN0673 # 01 Y:2000 01 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,075 $2,610 Implemented
TN0673 # 06 Y:2000 06 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $160 $0 Implemented
ME0280 # 01 Y:1999 01 1999 INSTALL SENSORS TO DETECT DEFECTS $243,000 $20,108 Implemented
ME0280 # 02 Y:1999 02 1999 MOVE PRODUCT USING MECHANICAL MEANS $105,600 $6,000 Implemented
ME0280 # 03 Y:1999 03 1999 MODIFY CURRENT INCENTIVE PROGRAM $15,000 $0 Implemented
ME0280 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,958 $28,528 Implemented
ME0280 # 06 Y:1999 06 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,402 $4,940 Implemented
ME0280 # 08 Y:1999 08 1999 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $1,092 $1,240 Implemented
ME0280 # 09 Y:1999 09 1999 MODIFY CURRENT INCENTIVE PROGRAM $55,341 $30,500 Implemented
AR0181 # 01 Y:2000 01 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $368 $340 Implemented
AR0181 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,363 $500 Implemented
AR0181 # 04 Y:2000 04 2000 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $23,800 $16,000 Implemented
BD0150 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,594 $12,790 Implemented
BD0150 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,905 $1,000 Implemented
BD0150 # 04 Y:1999 04 1999 INSTALL OCCUPANCY SENSORS $3,844 $3,750 Implemented