IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,274

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0334 # 03 Y:1998 03 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $4,900 $0 Implemented
AM0334 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,300 $1,000 Implemented
AM0334 # 06 Y:1998 06 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,070 $35 Implemented
AM0334 # 07 Y:1998 07 1998 CONVERT TO AQUEOUS CLEANING SYSTEM $1,260 $1,030 Implemented
AM0334 # 09 Y:1998 09 1998 USE A RAG RECYCLE SERVICE $310 $0 Implemented
AM0334 # 10 Y:1998 10 1998 PAY BILLS ON TIME TO AVOID LATE FEES $300 $0 Implemented
AM0334 # 11 Y:1998 11 1998 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $220 $0 Implemented
KU0511 # 01 Y:1998 01 1998 RECOVER WASTE HEAT FROM EQUIPMENT $25,680 $19,610 Implemented
KU0511 # 03 Y:1998 03 1998 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,080 $3,040 Implemented
KU0511 # 04 Y:1998 04 1998 RECOVER WASTE HEAT FROM EQUIPMENT $2,570 $2,550 Implemented
KU0511 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,560 $800 Implemented
KU0511 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,670 $3,960 Implemented
KU0511 # 07 Y:1998 07 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $590 $360 Implemented
KU0511 # 08 Y:1998 08 1998 INSULATE BARE EQUIPMENT $230 $680 Implemented
KU0511 # 10 Y:1998 10 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $15,070 $17,000 Implemented
KU0511 # 12 Y:1998 12 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,560 $690 Implemented
KU0511 # 13 Y:1998 13 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $4,980 $10,000 Implemented
AM0333 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,300 $120 Implemented
AM0333 # 05 Y:1998 05 1998 PAY UTILITY BILLS ON TIME $100 $0 Implemented
BD0124 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,996 $900 Implemented
BD0124 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,869 $4,085 Implemented
BD0124 # 03 Y:1998 03 1998 UPGRADE CONTROLS ON COMPRESSORS $2,025 $0 Implemented
BD0124 # 09 Y:1998 09 1998 RECOVER AND REUSE WASTE MATERIAL $5,715 $2,500 Implemented
BD0122 # 04 Y:1998 04 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,934 $750 Implemented
BD0122 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $351 $250 Implemented