IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,546

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0191 # 08 Y:1998 08 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $12,650 $0 Implemented
SD0191 # 09 Y:1998 09 1998 TREAT AND REUSE RINSE WATERS $654 $750 Implemented
AS0219 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,150 $2,888 Implemented
AS0219 # 02 Y:1998 02 1998 USE SYNTHETIC LUBRICANT $101 $268 Implemented
AS0219 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,071 $60 Implemented
AS0219 # 04 Y:1998 04 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,138 $2,957 Implemented
AS0219 # 05 Y:1998 05 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,425 $1,500 Implemented
AS0219 # 06 Y:1998 06 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $36 $30 Implemented
HO0169 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,077 $6,192 Implemented
HO0169 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,676 $4,900 Implemented
HO0169 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,604 $2,236 Implemented
HO0169 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $777 $800 Implemented
HO0169 # 07 Y:1998 07 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $22,500 $14,400 Implemented
HO0169 # 08 Y:1998 08 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,000 $1,000 Implemented
AS0216 # 06 Y:1998 06 1998 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,307 $940 Implemented
AS0216 # 08 Y:1998 08 1998 ADOPT IN-HOUSE MATERIAL GENERATION $2,435 $375 Implemented
AS0216 # 09 Y:1998 09 1998 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $35,483 $960 Implemented
MO0222 # 01 Y:1998 01 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $16,288 $3,700 Implemented
MO0222 # 02 Y:1998 02 1998 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $14,171 $25,000 Implemented
MO0222 # 03 Y:1998 03 1998 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $12,629 $30,000 Implemented
MO0222 # 05 Y:1998 05 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $2,250 $5,000 Implemented
MO0222 # 10 Y:1998 10 1998 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $748 $735 Implemented
MO0222 # 11 Y:1998 11 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $180 $0 Implemented
MO0221 # 02 Y:1998 02 1998 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $14,206 $25,000 Implemented
MO0221 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $744 $1,472 Implemented