IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

125

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0148 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,097 $185 Implemented
IP0148 # 05 Y:2021 05 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $125 $522 Implemented
IP0148 # 02 Y:2021 02 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $844 $0 Implemented
MZ0249 # 01 Y:2018 01 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $607 $1,750 Implemented
MZ0249 # 04 Y:2018 04 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $115 $0 Implemented
MZ0249 # 02 Y:2018 02 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,248 $15,240 Implemented
MZ0249 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $257 $340 Implemented
MZ0249 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,399 $0 Implemented
BD0476 # 02 Y:2016 02 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,201 $1,400 Implemented
BD0475 # 04 Y:2016 04 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,266 $4,390 Implemented
BD0475 # 07 Y:2016 07 2016 USE SYNTHETIC LUBRICANT $1,663 $600 Implemented
BD0475 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,317 $600 Implemented
BD0475 # 10 Y:2016 10 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $779 $198 Implemented
BD0472 # 02 Y:2016 02 2016 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $5,739 $12,000 Implemented
BD0472 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,021 $12,366 Implemented
BD0471 # 10 Y:2015 10 2015 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $86,400 $1,050 Implemented
BD0471 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,732 $500 Implemented
BD0469 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $761 $455 Implemented
BD0469 # 11 Y:2015 11 2015 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $4,000 $100 Implemented
BD0467 # 04 Y:2015 04 2015 USE PHOTOCELL CONTROLS $2,275 $600 Implemented
BD0467 # 08 Y:2015 08 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $707 $104 Implemented
BD0467 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,782 $600 Implemented
BD0467 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $925 $450 Implemented
BD0430 # 07 Y:2013 07 2013 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $4,500 $10,000 Implemented
BD0399 # 02 Y:2011 02 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $18,396 $2,000 Implemented