Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
437
matching recommendationsSIC | 345 | Screw Machine Products, Bolts, Etc. |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0508 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,450 | $90 | Implemented |
CO0508 # 02 Y:2002 | 02 | 2002 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,230 | $7,000 | Implemented |
CO0508 # 04 Y:2002 | 04 | 2002 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $31,960 | $1,620 | Implemented |
OR0409 # 03 Y:2002 | 03 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,676 | $560 | Implemented |
OR0409 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,472 | $3,500 | Implemented |
OR0409 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,749 | $0 | Implemented |
IC0035 # 02 Y:2002 | 02 | 2002 | INSULATE BARE EQUIPMENT | $12,947 | $2,657 | Implemented |
IC0035 # 05 Y:2002 | 05 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,103 | $83,780 | Implemented |
IC0035 # 08 Y:2002 | 08 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,977 | $4,813 | Implemented |
IC0035 # 09 Y:2002 | 09 | 2002 | RECOVER AND REUSE WASTE MATERIAL | $97 | $120 | Implemented |
IC0035 # 10 Y:2002 | 10 | 2002 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $4,000 | $3,500 | Implemented |
WI0414 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,225 | $0 | Implemented |
WI0414 # 04 Y:2002 | 04 | 2002 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,730 | $0 | Implemented |
WI0414 # 07 Y:2002 | 07 | 2002 | INSTALL OCCUPANCY SENSORS | $1,071 | $2,400 | Implemented |
WI0414 # 08 Y:2002 | 08 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $754 | $350 | Implemented |
BD0196 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,477 | $200 | Implemented |
BD0196 # 06 Y:2001 | 06 | 2001 | INSTALL OCCUPANCY SENSORS | $984 | $1,725 | Implemented |
BD0196 # 10 Y:2001 | 10 | 2001 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $2,862 | $750 | Implemented |
MA0492 # 02 Y:2001 | 02 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,800 | $360 | Implemented |
MA0492 # 05 Y:2001 | 05 | 2001 | INSTALL OCCUPANCY SENSORS | $480 | $200 | Implemented |
MA0490 # 01 Y:2001 | 01 | 2001 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $7,248 | $0 | Implemented |
MA0490 # 03 Y:2001 | 03 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,500 | $390 | Implemented |
MA0490 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,100 | $1,000 | Implemented |
MA0490 # 07 Y:2001 | 07 | 2001 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,000 | $0 | Implemented |
AM0398 # 01 Y:2001 | 01 | 2001 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $0 | $0 | Implemented |